Primary Department: Purchasing
Primary Department Head/Elected Official: Kimberly J. Williams, JD
Secondary Department: Choose an item.
Secondary Department Head/Elected Official:
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): 250320
Vendor/Entity Legal Name (if applicable): ARS Construction LLC
MWBE Contracted Goal (if applicable): 31.64%
MWBE Current Participation (if applicable):
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.
Request Summary (Agenda Caption):
title
Request for approval of an award on the basis of low bid to ARS Construction LLC in the amount of $1,571,590 for construction of sidewalks for Cypress Station Area (2023) for Precinct 1 and for the County Clerk to execute any applicable bonds to be received (250320), MWBE Contracted Goal: 31.64%.
end
Background and Discussion:
This project is located in the North Houston area, in the proximity of the I-45 and Farm to Market 1960 Rd W Intersection. This project is proposing sidewalk on both sides of the existing roadway along Cypress Station Drive from Hollow Tree Lane to Wells Fargo Drive (Approx. 9,500 feet or 1.8 miles - both sides of the road) and Peakwood Drive from Cali Drive to West of Satinwood Drive (Approx. 1,600 feet or 0.3 miles - both sides of road) and Butterfield Rd from Hafer Rd to Cypress Station Dr (Approx. 791 feet or 0.15 miles - both sides or road) and Lantern Bend Dr from Cypress Station Dr to Westfield Pl Drive (Approx. 1,655 feet or 0.31 miles - both sides of road). The scope and proposed improvements include proposed sidewalk, driveway reconstruction as necessary, pavement striping and re-striping, and ADA compliant curb ramps.
Expected Impact:
In implementing the proposed improvements, this project seeks to increase pedestrian safety throughou...