Title: Request for approval of an amendment to an agreement with HR Green Inc., in the amount of $226,757, to provide design, bidding, and construction phase engineering services in support of a detention basin along HCFCD Unit C144-00-00 (Sims Bayou Watershed, Bond ID F-95, Project ID C144-00-00-E001, Agreement No. 2023-28, Precinct 1, MWBE Contracted Goal: 20%, MWBE Current Participation: 36%).
Attachments: 1. 101526 AMEND HR GREEN 2023-28 PCT 1 backup.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): C144-00-00-E001
Vendor/Entity Legal Name (if applicable): HR Green, Inc.

MWBE Contracted Goal (if applicable): 20%
MWBE Current Participation (if applicable): 36%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of an amendment to an agreement with HR Green Inc., in the amount of $226,757, to provide design, bidding, and construction phase engineering services in support of a detention basin along HCFCD Unit C144-00-00 (Sims Bayou Watershed, Bond ID F-95, Project ID C144-00-00-E001, Agreement No. 2023-28, Precinct 1, MWBE Contracted Goal: 20%, MWBE Current Participation: 36%).
end

Background and Discussion:
This first amendment will provide additional design, bidding and construction phase engineering services for Drainage improvements at Anderson Road and C144-00-00. This project occurs in the 2nd quartile under the 2022 Prioritization Framework approved by Commissioners Court. This amendment provides additional design, bidding and construction phase engineering services for the expanded scope and proposed construction phasing of the Drainage improvements at Anderson Road and C144-00-00.

Expected Impact:
The project seeks to reduce flood risks and strengthen resiliency in the Sims Bayou watershed by reducing inundation depth for 13 structures, and flood risk for 1 structure, 3.7 acres, and 0.08 miles of roadway for the 100-yr storm event.

Alternative Options:
The alternative to approval of this item would be to select a differ...