Primary Department: County Engineer
Primary Department Head/Elected Official: Dr. Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: Commissioner, Precinct 4
Secondary Department Head/Elected Official: Lesley Briones, Commissioner
Regular or Supplemental RCA: Regular RCA
Type of Request: Report
Project ID (if applicable): UPIN 24104MF3B601
Vendor/Entity Legal Name (if applicable): MBCO Engineering LLC
MWBE Contracted Goal (if applicable): 20.09%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a study report prepared by MBCO Engineering LLC, for Sidewalk - Various Locations HCMUD 102 - 2024, UPIN 24104MF3B601, Precinct 4.
end
Background and Discussion:
The County entered into an agreement with MBCO Engineering LLC on March 27, 2025, to provide professional services for the Sidewalk - Various Locations HCMUD 102 - 2024. Approval of the study report will conclude the Study Phase and initiate the Design Phase.
Expected Impact:
The study is anticipated to support proposed mobility and drainage improvements along major roadways within HC MUD 102 and Precinct 4. The project will enhance safety, mobility, and capacity specific to each location to provide safer travel for pedestrians.
Alternative Options:
If the County could not elect to approve this request, the consultant will be unable to complete the scope of work or proceed with the design phase. As a result, the safety and mobility benefits associated with the proposed improvements would not be achieved, thereby depriving residents and pedestrians of these enhancements.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrast...