File #: 25-4494    Version: 1 Name:
Type: Utility Agreement Status: Passed
File created: 7/17/2025 In control: Commissioners Court
On agenda: 8/7/2025 Final action: 8/7/2025
Title: Request for approval to execute a Utility Agreement with ONEOK NGL Distribution System, L.L.C., in connection with Pine Trails Subdivision Drainage Improvements (Sections 1-2-5-6) - 2018, UPIN 19101MF14202, Precinct 2.
Attachments: 1. 25-4494-UA-UPIN 19101MF14202-Pine Trails-ONEOK NGL Distribution System,LLC-P2
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Utility Agreement

Project ID (if applicable): UPIN 19101MF14202
Vendor/Entity Legal Name (if applicable): ONEOK NGL Distribution System, L.L.C.

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Request Summary (Agenda Caption):
title
Request for approval to execute a Utility Agreement with ONEOK NGL Distribution System, L.L.C., in connection with Pine Trails Subdivision Drainage Improvements (Sections 1-2-5-6) - 2018, UPIN 19101MF14202, Precinct 2.
end

Background and Discussion:
The Pine Trails Subdivision Drainage Improvements project is located in Northeast of Harris County in Precinct 2. The scope of work for this utility agreement includes Harris County installing 36" RCP storm sewer crossing using a full-length hand tunnel under the pipelines owned by ONEOK NGL Distribution System, L.L.C. in order to facilitate ditch restoration.
This agreement will permit Harris County to enter the easement and perform the work required to complete the planned drainage improvements.

Expected Impact:
This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the Pine Trails community. No impact on project schedule or cost anticipated.

Alternative Options:
If no action is taken, the project may not be constructed as scoped.



County Strategic Plan Goal: 5. Minimize the impact of climate change and disasters.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goa...