File #: 26-7167    Version: 1 Name:
Type: Interlocal Agreement Status: Passed
File created: 10/19/2026 In control: Commissioners Court
On agenda: 10/29/2026 Final action: 10/29/2026
Title: Request for approval of a joint use agreement with Texas Department of Transportation (TxDOT) to establish joint access within TxDOT right-of-way, allowing the Flood Control District to perform construction and permanent maintenance (Addicks Reservoir Watershed, Project ID U501-07-00-E002, CDBG-MIT, Agreement No. 2026-105, Precinct 4).
Attachments: 1. 102926 ILA TX DOT 2026-105 PCT 4 backup.pdf
Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Interlocal Agreement

Project ID (if applicable): N/A
Vendor/Entity Legal Name (if applicable): N/A

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of a joint use agreement with Texas Department of Transportation (TxDOT) to establish joint access within TxDOT right-of-way, allowing the Flood Control District to perform construction and permanent maintenance (Addicks Reservoir Watershed, Project ID U501-07-00-E002, CDBG-MIT, Agreement No. 2026-105, Precinct 4).
end

Background and Discussion:
This agreement will allow access for both construction and permanent maintenance operations of Basin West 3. The Stormwater Detention Basins on South Mayde Creek Near the Grand Parkway – Phase 1 (Project) has recently commenced construction. The Project is located west of Grand Parkway, North of Clay Road, south of Stockdick School Road, east of Peek Road, and within Harris County Precinct 4. The objective of the Project is to maximize stormwater storage capacity and reduce flood risk along South Mayde Creek (Unit ID: U101-00-00).

The Project will include construction of two wet-bottom compartments (West 2 and West 3) with gravity-only outfalls and overflow spillways into South Mayde Creek. Access to West 3 will come via Clay Road, with permanent access through TxDOT right-of-way, a CenterPoint easement, and a low-water crossing at the U201-09-00 channel. An Agreement has been prepared by the County Attorney...