Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 24/0075, UPIN 15104MF0DN02
Vendor/Entity Legal Name (if applicable): Brice Construction & Design, LLC
MWBE Contracted Goal (if applicable): 30%
MWBE Current Participation (if applicable): 99.70%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Brice Construction & Design, LLC in connection with Telge Rd. Segment 4 - from 1,650-ft North of Louetta Rd to 1,780-ft North of Telge Ranch Rd - 2014, with an addition in the amount of $75,515.37, Job No. 24/0075-2, UPIN 15104MF0DN02, Precinct 3, MWBE Contracted Goal: 30%, MWBE Current Participation: 99.70%.
end
Background and Discussion:
Project included the reconstruction of Upgrade Telge Road from 1,650-feet North of Louetta Road to 1,780-feet North of Telge Ranch Road. Reconstruction includes an upgrade of the roadway from a two-lane asphalt road with open ditches to a 4-lane concrete curb and gutter boulevard with a 32' raised median. To facilitate the installation of roadway infrastructure, the bollard needed to be removed and replaced. In addition, installation of the storm trunk line required the removal of the existing conflicting waterline, installation of a temporary waterline connection, and pumping of water at the conflict location. This change order also accounts for quantity adjustments, including underruns and overruns of various bid items, to ensure accurate project tracking and compensation.
The change in cont...
Click here for full text