Primary Department: Flood Control District
Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Grant - Application
Project ID (if applicable): G103-80-03.1-E001
Vendor/Entity Legal Name (if applicable): U.S. Environmental Protection Agency
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): HCFCD, HCTRA, HHS
Request Summary (Agenda Caption):
title
Request by the Flood Control District for approval to submit an application to the U.S. Environmental Protection Agency for grant funds in the amount of $1,750,000 with a required cash match of $437,500, for the FY 2024 Clean Water State and Tribal Assistance Grant Program (Taylor Gully Channel Conveyance Improvements and Woodridge Stormwater Detention Basin Project, San Jacinto River Watershed, Bond ID F-14, Project ID G103-80-03.1-E001, Precinct 3).
end
Background and Discussion:
It is recommended that the Flood Control District be authorized to apply for grant award funds from the Environmental Protection Agency (EPA) Fiscal Year 2024 Clean Water STAG (Congressionally Directed) Grant Program to fund the construction of the Taylor Gully Channel Conveyance Improvements and Woodridge Stormwater Detention Basin Project (G103-80-03.1-E001) in the San Jacinto River Watershed. The proposed G103-80-03.1-E001 Taylor Gully Channel Conveyance Improvements and Woodridge Stormwater Detention Basin project will further reduce riverine flood risk in the San Jacinto River Watershed. The Flood Control District plans to source the required local cash match ($437,500) from the Bond Program. Federal appropriations funding for thi...
Click here for full text