File #: 25-4627    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 7/22/2025 In control: Commissioners Court
On agenda: 8/7/2025 Final action: 8/7/2025
Title: Request for approval of a change in contract with CE Barker Ltd., in connection with final construction of Barrett Station (Phase 1 - Dreamland Place) Subdivision Drainage Improvements aka Barrett Station Drainage Improvements, with no change in the amount, Job No. 23/0278-6, Bond Fund, UPIN 19102MF17801, Precinct 3, MWBE Contracted Goal: 26%, MWBE Current Participation: 37.32%.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

Project ID (if applicable): Job No: 23/0278, UPIN 19102MF17801
Vendor/Entity Legal Name (if applicable): CE Barker Ltd.

MWBE Contracted Goal (if applicable): 26%
MWBE Current Participation (if applicable): 37.32%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of a change in contract with CE Barker Ltd., in connection with final construction of Barrett Station (Phase 1 - Dreamland Place) Subdivision Drainage Improvements aka Barrett Station Drainage Improvements, with no change in the amount, Job No. 23/0278-6, Bond Fund, UPIN 19102MF17801, Precinct 3, MWBE Contracted Goal: 26%, MWBE Current Participation: 37.32%.
end

Background and Discussion:
Barrett Station (Phase 1 - Dreamland Place) Subdivision Drainage Improvements project is in the Northeast area of Harris County, east of FM 2100 and north of FM 1942. The scope of this project includes regrading roadside ditches, replace undersized driveway culverts, removal and replacement of driveways, road replacement in certain sections and construction of a dry bottom detention basin with pump station on the northeast corner of the subdivision, south of East Broussard.

There are no changes in the contract.

Expected Impact:
This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the Barrett Station (Phase 1 - Dreamland Place) subdivision.

Alternative Options:
The County could elect to fund th...