Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 23/0225, UPIN 18102MF0S601
Vendor/Entity Legal Name (if applicable): D&W Contractors, Inc.
MWBE Contracted Goal (if applicable): 29%
MWBE Current Participation (if applicable): 44.02%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with D&W Contractors, Inc., in connection with Wallisville Road - from 965' West of Garth Road to 1,400' West of North Main Street - 2017, with an addition in the amount of $5,000.00, Job No. 23/0225-4, UPIN 18102MF0S601, Precinct 3, MWBE Contracted Goal: 29%, MWBE Current Participation: 44.02%.
end
Background and Discussion:
The project includes reconstruction of Wallisville Road - from 965 feet west of Garth Road to 1,400 feet west of North Main Street. Reconstruction includes an upgrade of the roadway from a two-lane asphalt road with open ditches to a 4-lane concrete curb and gutter boulevard with a 32' raised median.
This change in contracts includes:
* PCO #17 (RFI #74): Installation of a modified Type C drop inlet at Station 10+17 to capture flow from an off-site swale. Cost $5,000.00
Expected Impact:
This change is to compensate the contractor for performing necessary work required to ensure proper drainage.
Alternative Options:
There is no alternative for as this is required for proper drainage.
County Strategic Plan Goal: N/A
County Strategic Plan Objective: N/A
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): N/A
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initia...
Click here for full text