Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 25/0363, UPIN 22102MF24Y01
Vendor/Entity Legal Name (if applicable): Precise Services, Inc.
MWBE Contracted Goal (if applicable): 28.87%
MWBE Current Participation (if applicable): 100.00%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
...title
Request for approval of a change in contract with Precise Services, Inc., in connection with the construction of Roadway - South Sheldon at Market Street Intersection and Related Drainage Improvements 2021, adding 26 calendar days, with an addition in the amount of $169,669.00, Job No. 25/0363-1, UPIN 22102MF24Y01, Precinct 2, MWBE Contracted Goal: 28.87%, MWBE Current Participation: 100%.
...end
Background and Discussion:
This project is part of Precinct 2 REVIVE2THRIVE to enhance drivability and provide a safe driving environment along Harris County. The project consists of reconstruction of approximately 18,600 SY 10” thick reinforced concrete roadway with new traffic signals, and construction of approximately 2,000 LF of concrete sidewalk, and approximately 4,700 LF of storm sewer pipes.
PCO#1 - This change order is necessary to address unforeseen underground utility conflicts involving existing 4-inch gravity sanitary sewer lines and a waterline interfering with the proposed storm sewer improvements along Market Street. Due to limited space within the utility corridor, the need to maintain uninterrupted sanitary sewer service, and the inability to adjust existing flowline elevations...
Click here for full text