Legislation Details

File #: 26-6082    Version: 1 Name:
Type: Transmittal Status: Agenda Ready
File created: 9/3/2026 In control: Commissioners Court
On agenda: 9/17/2026 Final action:
Title: Transmittal by the Office of the Purchasing Agent of an award of a Community Development Block Grant Disaster Recovery (CDBG-DR)/Community Development Block Grant Mitigation (CDBG-MIT) Program(s) project on the basis of lowest priced proposal meeting requirements to DNT Construction, LLC in the amount of $9,770,000 for Isom Stormwater Detention Basin for the Flood Control District, and for the County Clerk to execute any applicable bonds to be received (260086), MWBE Contracted Goal: 18.40%.
Attachments: 1. 26-6082 Transmittal of Award Job No. 260086 DNT Construction, LLC.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Primary Department: Purchasing
Primary Department Head/Elected Official: Kimberly J. Williams, JD

Secondary Department: Flood Control District
Secondary Department Head/Elected Official: Marcus Stuckett

Regular or Supplemental RCA: Regular RCA

Type of Request: Transmittal

Project ID (if applicable): 260086
Vendor/Entity Legal Name (if applicable): DNT Construction, LLC

MWBE Contracted Goal (if applicable): 18.40%
MWBE Current Participation (if applicable):
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

Request Summary (Agenda Caption):
title
Transmittal by the Office of the Purchasing Agent of an award of a Community Development Block Grant Disaster Recovery (CDBG-DR)/Community Development Block Grant Mitigation (CDBG-MIT) Program(s) project on the basis of lowest priced proposal meeting requirements to DNT Construction, LLC in the amount of $9,770,000 for Isom Stormwater Detention Basin for the Flood Control District, and for the County Clerk to execute any applicable bonds to be received (260086), MWBE Contracted Goal: 18.40%.
end

Background and Discussion:
The Isom Stormwater Detention Basin project consists of construction of a regional dry-bottom stormwater detention basin that combines and expands existing Harris County Flood Control District (HCFCD) and Texas Department of Transportation (TxDOT) detention facilities (SWDB Units P518-11-00 and P518-07-00) within existing HCFCD and TxDOT rights-of-way. Work includes excavation and grading to reconfigure and hydraulically connect the existing basins to provide approximately 334.6 acre-feet of additional detention storage; modification of an existing spillway; construction of backslope swales, interceptor structures, outfalls, concrete pilot channels, and a stormwater quality weir; and implementation of environmental mitigation, erosion...