Legislation Details

File #: 26-6066    Version: 1 Name:
Type: Public Necessity Status: Agenda Ready
File created: 9/3/2026 In control: Commissioners Court
On agenda: 9/17/2026 Final action:
Title: Request for approval to decree that the Harris County Flood Control District project serves a public purpose and public necessity, which requires that the Harris County Real Property Division be directed to acquire 18 fee simple tracts for the public project known as Stormwater Detention Basins on Halls Bayou near Hardy West, for the purpose of channel improvements and stormwater detention, authorizing eminent domain if necessary (Halls Bayou Watershed, Bond ID C-41, Project ID P518-15-00-E001, CDBG-MIT, Precinct 2).
Attachments: 1. 091726 PN P518-15-00-E001 PCT 2 backup.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Public Necessity

Project ID (if applicable): P518-15-00-E001
Vendor/Entity Legal Name (if applicable): N/A

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval to decree that the Harris County Flood Control District project serves a public purpose and public necessity, which requires that the Harris County Real Property Division be directed to acquire 18 fee simple tracts for the public project known as Stormwater Detention Basins on Halls Bayou near Hardy West, for the purpose of channel improvements and stormwater detention, authorizing eminent domain if necessary (Halls Bayou Watershed, Bond ID C-41, Project ID P518-15-00-E001, CDBG-MIT, Precinct 2).
end

Background and Discussion:
This is a request to approve right-of-way acquisition for Stormwater Detention Basins on Halls Bayou near Hardy West in the Greens Bayou watershed. These properties are located north of Halls Bayou, south of Hill Road, west of Hardy Toll Road, and east of Woodmoss Drive.

Expected Impact:
These properties will be used for/provide stormwater detention basins to reduce water surface elevations along the P118-00-00 channel.

Alternative Options:
Not approving this item would result in major changes to the design and reduction of the proposed improvements and significantly reduced benefits to the population, as well as potential loss of CDBG funding for the project.

County Strategic Plan Goal: 5. Minimize the impact ...