Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Utility Agreement
Project ID (if applicable): 2508210138
Vendor/Entity Legal Name (if applicable): CenterPoint Energy Houston Electric, LLC
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to execute a Service Outlet Location Statement for installation of an electric meter with CenterPoint Energy Houston Electric, LLC and authorize the County Auditor to pay monthly bills for 22611 ½ Elyson Falls Drive, Katy, Texas 77449 for electrical power serving a traffic signal, Elyson Falls Drive and Prospect Oaks Parkway, ePermits Project Number: 2508210138, Precinct 4.
end
Background and Discussion:
As part of the development in the area, a traffic impact analysis was conducted and submitted to Harris
County Permits for review and approval. The aforementioned performed analysis warranted a traffic signal at
the intersection of Elyson Falls Drive and Prospect Oaks Parkway, which the developer committed to construct.
Expected Impact:
Approval of the service outlet location statement will allow CenterPoint Energy Houston Electric, LLC to provide electrical service to the traffic signal, which is needed to enhance operations of the intersection of Elyson Falls Drive and Prospect Oaks Parkway.
Alternative Options:
All Traffic Signals require a power source, which is typically obtained through CenterPoint Energy Houston
Electric, LLC. Alternative options are to place a generator, which...
Click here for full text