Title: Request for approval of a study report prepared by Midtown Engineers, Inc., for Subdivision Improvements - Highlands – 2024 Project, UPIN 24208MF3F901, Precinct 3.
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Secondary Department: Commissioner, Precinct 3
Secondary Department Head/Elected Official: Tom S. Ramsey, P.E.

Regular or Supplemental RCA: Regular RCA

Type of Request: Report

Project ID (if applicable): 24208MF3F901
Vendor/Entity Legal Name (if applicable): Midtown Engineers, LLC

MWBE Contracted Goal (if applicable): 3.77%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Request for approval of a study report prepared by Midtown Engineers, Inc., for Subdivision Improvements - Highlands – 2024 Project, UPIN 24208MF3F901, Precinct 3.
end

Background and Discussion:
Precinct requested the Office of the County Engineer to enter into an agreement for professional engineering services to remove the roadside ditches, and construct five-foot-wide sidewalks by installing a storm sewer system for subdivisions in the Highlands area. The study phase will cover the entire area, with Phase One focusing on design and construction. The Highlands area is bounded by West Canal Road to the north, Crosby Lynchburg Road to the east, Harris Road to the south and the San Jacinto River to the west.

Expected Impact:
This project seeks to enhance pedestrian safety and provide drainage improvements within the project limit. It will support grant funding efforts and enable a cost-effective multi-phase implementation plan aligned with available resources.

Alternative Options:
The County could elect to approve the requested task or choose to reject it. However, if not approved, the project may not be constructed as scoped.

County Strategic Plan Goal: 2. Connect our community with sa...