Legislation Details

File #: 26-7002    Version: 1 Name:
Type: Contract - Award Status: Agenda Ready
File created: 10/7/2026 In control: Commissioners Court
On agenda: 10/15/2026 Final action:
Title: Request by the Flood Control District for approval of a grant agreement with Texas Water Development Board in the amount of $2,500,000, to address flood risk mitigation through a combination of channel modification and stormwater detention basins along the middle reach of mainstem Greens Bayou (Bond ID C-20, Project ID P100-00-00-E015, Agreement No. 2026-114, Precincts 1 and 2).
Attachments: 1. 101526 AGMT TWDB 2026-114 PCTS 1 AND 2 backup.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Supplemental RCA

Type of Request: Contract - Award

Project ID (if applicable): P100-00-00-E015
Vendor/Entity Legal Name (if applicable): Texas Water Development Board (TWDB)

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): HCFCD, HCTRA, HHS

Request Summary (Agenda Caption):
title
Request by the Flood Control District for approval of a grant agreement with Texas Water Development Board in the amount of $2,500,000, to address flood risk mitigation through a combination of channel modification and stormwater detention basins along the middle reach of mainstem Greens Bayou (Bond ID C-20, Project ID P100-00-00-E015, Agreement No. 2026-114, Precincts 1 and 2).
end

Background and Discussion:
This Agreement will address flood risk mitigation through a combination of channel modification and
stormwater detention basins along the middle reach of mainstem Greens Bayou. The 89th Texas Legislature allocated funds in Senate Bill 1 to the Harris County Flood Control District. Senate Bill 1 was signed by the Governor on June 22, 2025, and will be effective on September 1, 2025. This allocation from the Texas Legislature is being obtained through the Texas Water Development Board. The project in Senate Bill 1 is the Greens Bayou Watershed Channel Improvements in the Greens Bayou Watershed.

Expected Impact:
This agreement will fund project design that will determine the ultimate benefits provided. It is estimated that following the ultimate project, the 100-year inundation area would be removed from approximately 1,042 stru...

Click here for full text