Title: Transmittal by the Commissioner of Precinct 4 of acceptance from the U.S. Army Corps of Engineers License No. DACW64-3-26-0011, a temporary license allowing construction of a trail as part of the Buffalo Bayou and Tributaries Project, Barker Dam and Reservoir along a drainage channel from S. Mason Road to the George Bush Park trail bridge, a portion of which is over, across, in and upon lands of the United States (Tract BR-87).
Attachments: 1. 18. Trans - Willowfork Temp License.pdf
Primary Department: Commissioner, Precinct 4
Primary Department Head/Elected Official: Lesley Briones, Commissioner

Secondary Department: N/A
Secondary Department Head/Elected Official: N/A

Regular or Supplemental RCA: Regular RCA

Type of Request: Transmittal

Project ID (if applicable): N/A
Vendor/Entity Legal Name (if applicable): U.S. Army Corps of Engineers (USACE)

MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request

Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

Request Summary (Agenda Caption):
title
Transmittal by the Commissioner of Precinct 4 of acceptance from the U.S. Army Corps of Engineers License No. DACW64-3-26-0011, a temporary license allowing construction of a trail as part of the Buffalo Bayou and Tributaries Project, Barker Dam and Reservoir along a drainage channel from S. Mason Road to the George Bush Park trail bridge, a portion of which is over, across, in and upon lands of the United States (Tract BR-87).
end

Background and Discussion:
The temporary license allows Harris County to construct a hike and bike trail along T103-00-00 from Mason Road to approximately 2,600 linear feet east of South Fry Road totaling approximately 1.89 miles in length.

Expected Impact:
This will enable the construction of a trail connecting George Bush Park Trail to S. Mason Rd, which will lead to an improvement in the quality of life.

Alternative Options:
If the license is not authorized, then the trail will not be constructed.

County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: I: Increase access to safe, clean, and enjoyable green space.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): N/A
Econom...