Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 25/0404, UPIN 24102MF3AH01
Vendor/Entity Legal Name (if applicable): MC2 Civil LLC
MWBE Contracted Goal (if applicable): 27.80%
MWBE Current Participation (if applicable): 25.21%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
...title
Request for approval of a change in contract with MC2 Civil LLC, in connection with final construction of Bridge Maintenance - De Zavalla Road at HCFCD Unit N101-00-00 - 2024, with an addition in the amount of $38,978.84, Job No. 25/0404-1, UPIN 24102MF3AH01, Precinct 2, MWBE Contracted Goal: 27.80%, MWBE Current Participation: 25.21%.
...end
Background and Discussion:
The project includes erosion repairs along De Zavalla Road at HCFCD Unit N101-00-00 in Precinct 2. The work includes extending the existing steel sheet pile wall, removing and replacing the failed asphalt shoulder, repairing/extending the existing guardrail and mowing strip, and installing riprap
This change in contract includes:
PCO#1 – This change order is required to address unforeseen field conditions and operational constraints encountered during construction of the De Zavalla Bridge project. To maintain safe access for the traveling public and adjacent businesses during construction work, the Contractor must implement additional traffic control measures, including police officers and/or flaggers, portable light towers, and additional labor to open and close the roadway each workday. Nighttime operations are also necessary to...
Click here for full text