Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: Commissioner, Precinct 3
Secondary Department Head/Elected Official: Tom S. Ramsey, P.E., Commissioner
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): UPIN - 26103EO8MM01
Vendor/Entity Legal Name (if applicable): DCCM Infrastructure, Inc.
MWBE Contracted Goal (if applicable): 3.00%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with DCCM Infrastructure, Inc. in the amount of $262,695.00 for Professional Engineering Services in connection with Roadway Maintenance - Asphalt Package Atascocita - 2026, UPIN 26103EO8MM01, Precinct 3, MWBE Contracted Goal: 3.00%.
end
Background and Discussion:
Precinct 3 is requesting the Office of the County Engineer to enter into an agreement for professional engineering services to provide the design of an asphalt roadway rehabilitation plan for 4.10 miles of various road in the Atascocita area within Precinct 3. The maintenance repair options include base repair, mill and overlay and other pavement repair options such as hot or cold in place recycling, if recommended by the design team.
Expected Impact:
The maintenance project will improve the road quality for the community in the specified area.
Alternative Options:
Without this project, the roads cannot be maintained properly. The goal is to provide better mobility and/or
eliminate hazards from the roadway as requested by the Precinct.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-mainta...