Department: District Clerk
Department Head: Marilyn Burgess
Regular or Supplemental RCA: Supplemental RCA
Type of Request: Investment Memo
Investment Memo Type: Final Investment Memo
Project Name: District Clerk Restroom Addition
Project ID (if applicable): TBD
Vendor Legal Name (if applicable): N/A
MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Achievement (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request
Managing Entity: Office of County Engineer
Incremental Authorization Requested: $284,500
Total Estimated Project Cost: $284,500
Request Summary:
title
Request by the District Clerk for approval of a Final Investment Memo for the District Clerk Restroom Addition project for an initial amount of $284,500.
end
Project Description:
The District Clerk’s Office (DCO) is requesting the renovation of the 1st floor restrooms at 5900 Canal to address critical deficiencies in the existing facilities. The proposed renovation will introduce modern, efficient restrooms designed to accommodate the current and anticipated increase in staff levels. As the number of employees and officers at the facility continues to grow, these upgraded restrooms will ensure that all personnel have access to adequate and sanitary facilities, significantly enhancing comfort and operational efficiency.
Project Scope:
The detailed scope of work for the 1st floor restroom renovation at 5900 Canal is listed in the table below. The proposed costs of this project include a $6,300 consultant fee from Gordian. In addition, a $26,000 contingency cost for unforeseen issues is included for a total of $284,500. Please see an overview of the scope of work below:
• Site Preparation: Includes site clearing, grading, and excavation as necessary for the renovation.
• Structural Work: Encompasses concrete removal and replacement, masonry work for new walls and partitions, and repair of existing structural elements.
• Finishes and Installations: Involves applying durable finishes to walls, floors, and ceilings; installing restroom fixtures, partitions, and accessories; and ensuring seamless integration into the existing design.
• Systems Upgrades: Covers the upgrade of plumbing systems, installation of new HVAC systems for proper ventilation, and updating electrical systems to support new fixtures and lighting.
• Protection Measures: Includes installation of moisture-resistant materials and thermal insulation to ensure durability and comfort.
While minor operational adjustments may occur during this project, the overall scope of the restroom renovation project will remain consistent. Any significant changes or additional authorizations will require approval from the Commissioners Court.
Justification:
The renovation of the 1st floor restrooms at 5900 Canal is essential due to the current inadequacies in restroom facilities, which are unable to support the growing number of staff and officers using the building. The existing facilities are frequently overcrowded, leading to discomfort and potential disruptions in work efficiency.
Upgrading to modern, efficient restrooms will enhance staff comfort and improve operational efficiency. This project will address these critical issues, providing a functional and sanitary environment that supports the increased demand and maintains high standards of workplace functionality.
Alternatives and Engagement:
Not funding this project would continue to exacerbate the existing congestion, leading to diminished staff comfort and potential disruptions in work efficiency at the location. Additionally, delays in this project may increase costs due to increased costs of material and labor.
Anticipated Project Expenditures and Timeline:
Scope of Work |
Estimated Cost |
Estimated Completion |
General Requirements |
$55,300 |
|
Site Work |
$4,000 |
|
Concrete |
$15,100 |
|
Masonry |
$15,800 |
|
Thermal and Moisture Protection |
$2,500 |
|
Openings |
$13,000 |
|
Finishes |
$97,500 |
|
Specialties |
$13,400 |
|
Upgrade Plumbing System |
$24,700 |
|
Install New Electrical System |
$9,100 |
|
Earthwork |
$1,800 |
|
Gordian (Consultant) |
$6,300 |
|
Contingency (10%) |
$26,000 |
|
Total |
$284,500 |
- |
Alignment with Goal(s):
X Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
_ Transportation
_ Flooding
_ Environment
X Governance and Customer Service
Previous Court Action: N/A
Date |
Agenda Item # |
Action Taken |
|
|
|
|
|
|
|
|
|
Address: 5900 Canal St, Houston, Texas, 77011
Precinct(s): Precinct 2
Fiscal and Personnel Summary |
Service Name |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
|
|
|
|
Funding Sources |
|
Existing Budget |
|
|
|
|
Commercial Paper |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Current Budget |
$ |
$ |
$ |
$ |
Additional Budget Request |
|
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Additional Budget Request |
$ |
$ |
$ |
$ |
Total Funding Request |
$ |
$ |
$ |
$ |
Personnel (Fill out section only if requesting new PCNs) |
|
Current Position Count for Service |
- |
- |
- |
- |
Additional Positions Request |
- |
- |
- |
- |
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: September 19, 2024
Anticipated Implementation Date (if different from Court date): N/A
Legal funding compliance confirmed by: Paige Abernathy, CAO, 9/9/2024
Department Approval by: Wes McCoy, Chief Deputy of Administration
OMB CIP Team Approval by: Amiel Chen, OMB, CIP Manager, 9/3/24
Commercial Paper Request (For OMB use only):
Receiving Department: N/A
Project PeopleSoft ID: N/A
CP Series Description: N/A
OMB Financial Management contact: N/A