Legislation Details

File #: 24-3586    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 6/10/2024 In control: Commissioners Court
On agenda: 6/25/2024 Final action: 6/25/2024
Title: Request for approval of a change in contract with Conrad Construction Co., Ltd. in connection with Anderson Road - Hiram Clarke Road to Almeda Road - 2018, adding 24 calendar days, with an addition in the amount of $70,650.00, Job No. 23/0152-1, UPIN 19101MF0XY01, Precinct 1, MWDBE Contracted Goal: 21%.

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E, PMP, CFM, ENV SP, County Engineer

 

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 23/0152, UPIN 19101MF0XY01

Vendor/Entity Legal Name (if applicable): Conrad Construction Co., Ltd.

 

MWDBE Contracted Goal (if applicable): 21%

MWDBE Current Participation (if applicable): 0%

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Conrad Construction Co., Ltd. in connection with Anderson Road - Hiram Clarke Road to Almeda Road - 2018, adding 24 calendar days, with an addition in the amount of $70,650.00, Job No. 23/0152-1, UPIN 19101MF0XY01, Precinct 1, MWDBE Contracted Goal: 21%.

end

 

Background and Discussion:

Project includes completion of the two-lane concrete curb and gutter road with sidewalk on both sides and left turn lanes at the intersections approximately 7,800 linear feet of Anderson Road construction from 500 feet west of Hiram Clark Road to Almeda Road/FM 521 (Segment 2).

 

This change in contracts includes:

Item #97 - Low-Profile Concrete Barrier (Relocate) - Increase Low-Profile Concrete Barrier quantity 400 linear feet. Concrete barrier is needed during storm sewer construction and allow for Center Point Energy relocation of gas line ($12,800.00 - 14 days).

 

Item # 159 - Furnish and Install barbed wire fence at detention pond (Includes demolition of existing fence) - Cost proposal for the removal or replacement of 2,750 linear feet of barbed wire fence around the newly acquired right of way for the pond work ($32,050.00 - 3 days).

 

Item #152 - Well Pointing (Minimum Bid $25/linear feet) - Well pointing needed to remove the groundwater for storm sewer installation - Increase well pointing quantity 500 linear feet ($15,000.00 - 7 days).

 

Item #157 - Temporary Pavement Markings (Larger Quantity) - Buttons (Yellow) 4 inches (Solid) (Removable) Furnished - Applied and Removed. - Increase quantity of yellow buttons of 5,400 linear feet ($10,800.00 - 0 days).

 

Expected Impact:

Change allows the contractor to be compensated for the items which were in the plan but missed in the bid tab.

 

Alternative Options:

Maintain the original scope of the project.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

_X Transportation

_X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

06/27/2023

23-3490

Contract Award

Location:

Address (if applicable): Anderson Road, Houston, Texas 77053

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other Fund 3109

$

$70,650.00

$70,650.00

$

Choose an item.

$

 

$

$

 

$

 

$

$

Total Current Budget

$

$70,650.00

$70,650.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$70,650.00

$70,650.00

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: June 25, 2024

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Erwin Burden, PE, Senior Director of Capital Project Infrastructure, Harris County Engineering Department

Attachments (if applicable): County Auditor’s Form 1258B