Legislation Details

File #: 26-0609    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 1/13/2026 In control: Commissioners Court
On agenda: 1/29/2026 Final action: 1/29/2026
Title: Request for approval to execute an agreement with Terracon Consultants, Inc., in the amount of $188,787.00 for Professional Engineering Services regarding Construction Materials Testing and related Service for Roadway - South Sheldon at Market Street Intersection and Related Drainage Improvements, UPIN 22102MF24Y01, Precinct 2, Justification for 0% MWBE Participation Goal: 0% - Non-Divisible.
Attachments: 1. 26-0609-22102MF24Y01 -Roadway - South Sheldon at Market Street - Terracon-1.29.26.pdf

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV-SP, County Engineer

 

Secondary Department: Commissioner, Precinct 2

Secondary Department Head/Elected Official: Adrian Garcia, Commissioner

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): UPIN 22102MF24Y01; Job No. 25/0363

Vendor/Entity Legal Name (if applicable): Terracon Consultants, Inc.

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  0% - Non-Divisible

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an agreement with Terracon Consultants, Inc., in the amount of $188,787.00 for Professional Engineering Services regarding Construction Materials Testing and related Service for Roadway - South Sheldon at Market Street Intersection and Related Drainage Improvements, UPIN 22102MF24Y01, Precinct 2, Justification for 0% MWBE Participation Goal:  0% - Non-Divisible.

end

 

Background and Discussion:

 

Precinct 2 will construct Sheldon Road at Market Street intersection in Harris County to add raised medians for the east, west, and north approaches. The intersection improvements shall include signal upgrades and drainage mitigation. Precinct 2 will determine the appropriate improvement limits and type of drainage improvements, extent of the dedicated left turn lanes, and number and type of lanes for each approach based on the best cost to benefit and safety benefit to the traveling public and Precinct 2 will obtain the State’s approval of the design.

 

Expected Impact:

 

 This agreement will allow the firm to conduct field and laboratory testing on soil, concrete, asphalt and various other construction materials to ensure the material’s compliance with Harris County Engineering Department’s adopted standards and specifications as required by state law.

 

Alternative Options:

 

Construction materials testing is required by state law.  Thus, alternatives include issuing a purchase order for similar services to a different vendor or cancelling this construction project.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any): N/A - Vendor Pool Selection

Date

Agenda Item #

Action Taken

 

 

 

 

Location: Roadway - South Sheldon at Market Street Intersection

Address (if applicable): N/A

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$188,787.00

$188,787.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$188,787.00

$188,787.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$188,787.00

$188,787.00

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 1/29/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

 

Attachments (if applicable): Contracts & Exhibits