Title: Request for approval of a change in contract with Triple B Services, LLP, in connection with Asphalt Reconstruction Project - Aldine-Westfield Rd. Corridor - 2022, adding 25 calendar days, with an addition in the amount of $144,210.00, Job No. 22/0440-1, UPIN 22101MF2J701, Precinct 1, MWDBE Contracted Goal: 32.10%.

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 22/0440

Vendor/Entity Legal Name (if applicable): Triple B Services, LLP

 

MWDBE Contracted Goal (if applicable): 32.10%

MWDBE Current Participation (if applicable): 0%

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Triple B Services, LLP, in connection with Asphalt Reconstruction Project - Aldine-Westfield Rd. Corridor - 2022, adding 25 calendar days, with an addition in the amount of $144,210.00, Job No. 22/0440-1, UPIN 22101MF2J701, Precinct 1, MWDBE Contracted Goal: 32.10%.

end

 

Background and Discussion:

 

Project is an asphalt roadway reconstruction and rehabilitation along various roadways and roadside ditch rehabilitation in Precinct 1.

 

This change order includes the addition of asphalt base repair not originally in the contract and addition of days to contract to complete additional work.

 

•                     Increasing line item # 16 BASE REPAIR WITH HOT MIX ASPHALITC CONCRETE BASE COURSE (BLACK BASE)- 10" DEPTH.  This change order will add $144,210 and 25 days to the contract.

 

Expected Impact:

 

This change order will cause adjustment to the original contract to reflect actual work performed due to actual field condition and allow an increase of an existing line items so that the project can be completed in accordance with the original intent.

 

Alternative Options:

 

Leave out the additional base repairs and only perform the mill and overlay per plans.

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

_ Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

04/25/2023

238

Contract Award

 

Location:

Address (if applicable):

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

 

 

FY 24

FY 25

Next 3 FYs

Incremental Expenditures (do NOT write values in thousands or millions)

Labor Expenditures

$

$

$

Non-Labor Expenditures

$144,210.00

$

$

Total Incremental Expenditures

$144,210.00

$

$

Funding Sources (do NOT write values in thousands or millions)

Existing Budget

1070 - Mobility Fund

$144,210.00

$

$

Choose an item.

$

$

$

Total Current Budget

$144,210.00

$

$

Additional Budget Requested

Choose an item.

$

$

$

Choose an item.

$

$

$

Total Additional Budget Requested

$

$

$

Total Funding Sources

$144,210.00

$

$

Personnel (Fill out section only if requesting new PCNs)

Current Position Count for Service

-

-

-

Additional Positions Requested

-

-

-

Total Personnel

-

-

-

 

 

Anticipated Court Date:  January 30, 2024

Anticipated Implementation Date (if different from Court date): N/A

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Dr. Hatem Bastawisy, PE, (Interim) Senior Director of Project Delivery, Harris County Engineering Department