File #: 26-6029    Version: 1 Name:
Type: Contract - Amendment Status: Agenda Ready
File created: 9/3/2026 In control: Commissioners Court
On agenda: 9/17/2026 Final action:
Title: Request for approval of change in contract No. 1 with ERC Environmental & Construction Services, Inc., for the renovation of the distribution center at the Michael Talbot Service Center, adding 90 calendar days and resulting in an addition of $253,568 to the contract amount (Project ID Z100-00-00-X360, Job No. 26/0067, Precinct 1, MWBE Contracted Goal: 12.42%).
Attachments: 1. 091726 CIC ERC Z100-X360 CW backup .pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Primary Department: Flood Control District

Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Z100-00-00-X360

Vendor/Entity Legal Name (if applicable): ERC Environmental & Construction Services, Inc.

 

MWBE Contracted Goal (if applicable): 12.42%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of change in contract No. 1 with ERC Environmental & Construction Services, Inc., for the renovation of the distribution center at the Michael Talbot Service Center, adding 90 calendar days and resulting in an addition of $253,568 to the contract amount (Project ID Z100-00-00-X360, Job No. 26/0067, Precinct 1, MWBE Contracted Goal: 12.42%).

end

 

Background and Discussion:

This change in contract is needed to complete Harris County Flood Control’s Michael Talbott Maintenance

Base Camp renovations. When complete, these renovations will provide office space and parking for VATRE funded field staff growth until new Base Camps are built. The scope of the original ERC Environmental & Construction Services, Inc. contract was renovating the Distribution Center. This change in contract adds to renovating the Facilities Maintenance (FMT) Building which is also located at the Michael Talbott Maintenance Base Camp. This contract change includes $253,568 and 90 days. The FMT Remodel builds a shared office space with 4 workstations, a break area that includes 3 work surfaces and 2-time entry stations.

 

Expected Impact:

This change will allow the contractor to construct the project so that Harris County can realize intended flood risk reduction benefits. 

 

Alternative Options:

This is an active construction contract, so there are not many alternatives to approving a change order other than cancelling the contract, which is not recommended as doing so would substantially delay the remaining work in the construction contract.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

05/28/2026

68.

Award

 

Location: 10700 Vine Crest Drive, Houston, Texas 77086

Address (if applicable):

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

4.a.2 - Construction Services

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Tax Revenue - FCD

$

$253,568

$253,568

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$253,568

$253,568

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$253,568

$253,568

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 9/17/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 