Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: Commissioner, Precinct 3
Secondary Department Head/Elected Official: Tom S. Ramsey, Commissioner
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): UPIN 26103D1Y1B01
Vendor/Entity Legal Name (if applicable): Pape-Dawson Consulting Engineers, LLC
MWBE Contracted Goal (if applicable): 3%
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with Pape-Dawson Consulting Engineers, LLC, in the amount of $1,264,784.60 for Professional Engineering and related services in connection with Road Improvements - Fallbrook Dr. - From Huffmeister Rd to 600' West of Winter Wind Blvd - 2026, UPIN 26103D1Y1B01, Precinct 3, MWBE Contracted Goal: 3%.
end
Background and Discussion:
Precinct 3 is requesting the Office of the County Engineer to approve an agreement to provide professional engineering services for the design of a 4-lane concrete boulevard, in a 100-foot ROW with raised median and underground storm sewer system on Fallbrook Drive, from Huffmeister Road to 600' West of Winter Wind Boulevard. The design includes a bridge over HCFCD Unit #E133-01-00, the second half of the boulevard, from the HCFCD Unit #E133-00-00 to the existing portion of Fallbrook Drive (west of Winter Wind Boulevard), and 5' wide sidewalk on both sides of the boulevard within the project limits.
Expected Impact:
The design will improve vehicular and pedestrian connectivity for the communities along the roadway.
Alternative Options:
The alternative is for the existing 2-lane concrete road to remain as is, without the second half of the boulevard and connectivity to Huffmeister Road being designed.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): F1: Strengthen the County’s commitment to Vision Zero principles and goals.
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan:
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
N/A |
N/A |
N/A |
Location:
Address (if applicable): Fallbrook Dr. - From Huffmeister Rd to 600' West of Winter Wind Blvd
Precinct(s): Precinct 3
|
Fiscal and Personnel Summary |
|
Service Name |
Engineering |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Other - 3231 |
$ |
$1,264,784.60 |
$1,264,784.60 |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$1,264,784.60 |
$1,264,784.60 |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$1,264,784.60 |
$1,264,784.60 |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 11/12/2026
Anticipated Implementation Date (if different from Court date): N/A
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer
Attachments (if applicable): Contract & Exhibits