Legislation Details

File #: 26-7443    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 10/29/2026 In control: Commissioners Court
On agenda: 11/12/2026 Final action: 11/12/2026
Title: Request for approval to execute an agreement with Pape-Dawson Consulting Engineers, LLC, in the amount of $1,264,784.60 for Professional Engineering and related services in connection with Road Improvements - Fallbrook Dr. - From Huffmeister Rd to 600' West of Winter Wind Blvd - 2026, UPIN 26103D1Y1B01, Precinct 3, MWBE Contracted Goal: 3%.
Sponsors: Mony Hossain

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 3

Secondary Department Head/Elected Official: Tom S. Ramsey, Commissioner

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): UPIN 26103D1Y1B01

Vendor/Entity Legal Name (if applicable): Pape-Dawson Consulting Engineers, LLC

 

MWBE Contracted Goal (if applicable): 3%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an agreement with Pape-Dawson Consulting Engineers, LLC, in the amount of $1,264,784.60 for Professional Engineering and related services in connection with Road Improvements - Fallbrook Dr. - From Huffmeister Rd to 600' West of Winter Wind Blvd - 2026, UPIN 26103D1Y1B01, Precinct 3, MWBE Contracted Goal: 3%.

end

 

Background and Discussion:

 

Precinct 3 is requesting the Office of the County Engineer to approve an agreement to provide professional engineering services for the design of a 4-lane concrete boulevard, in a 100-foot ROW with raised median and underground storm sewer system on Fallbrook Drive, from Huffmeister Road to 600' West of Winter Wind Boulevard.  The design includes a bridge over HCFCD Unit #E133-01-00, the second half of the boulevard, from the HCFCD Unit #E133-00-00 to the existing portion of Fallbrook Drive (west of Winter Wind Boulevard), and 5' wide sidewalk on both sides of the boulevard within the project limits.

 

Expected Impact:

 

The design will improve vehicular and pedestrian connectivity for the communities along the roadway.

 

Alternative Options:

 

The alternative is for the existing 2-lane concrete road to remain as is, without the second half of the boulevard and connectivity to Huffmeister Road being designed.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

N/A

N/A

N/A

 

Location:

Address (if applicable): Fallbrook Dr. - From Huffmeister Rd to 600' West of Winter Wind Blvd

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other - 3231

$

$1,264,784.60

$1,264,784.60

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$1,264,784.60

$1,264,784.60

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$1,264,784.60

$1,264,784.60

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 11/12/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

 

Attachments (if applicable): Contract & Exhibits