File #: 24-0456    Version: 1 Name:
Type: Negotiation Status: Passed
File created: 1/18/2024 In control: Commissioners Court
On agenda: 1/30/2024 Final action: 1/30/2024
Title: Request for approval to negotiate an agreement with Fivengineering, LLC dba 5engineering, to provide engineering services to augment the Flood Control District's staff for drainage report reviews. (Project ID Z100-00-00-P031, Agreement No. 2023-52, Countywide).
Attachments: 1. 013024 ATN 5ENGINEERING 2023-52 CW backup.pdf

Department: Flood Control District

Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Negotiation

 

Project ID (if applicable): Z100-00-00-P031

Vendor/Entity Legal Name (if applicable): Fivengineering, LLC dba 5engineering

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request for approval to negotiate an agreement with Fivengineering, LLC dba 5engineering, to provide engineering services to augment the Flood Control District’s staff for drainage report reviews. (Project ID Z100-00-00-P031, Agreement No. 2023-52, Countywide).

end

 

Background and Discussion:

The Watershed Department receives Drainage Impact Analyses (DIA) for Hydrology and Hydraulics review by Risk Mitigation Department staff.  This is an ongoing service provided by the Flood Control District to ensure that proposed projects such as roadways and developments do not adversely impact the flood risk of others.  The Risk Mitigation Department reviewers are complimented by augmented staff who may be assigned DIA reviews, especially when the reviews utilize specialized software.

 

Expected Impact:

This will improve the quality of reviews of Drainage Impact Analyses that utilize specialized software.  It will also reduce average review turnaround time, as it reduces the case load for the in-house reviewers.

 

Alternative Options:

One alternative would be to hire an in-house reviewer with background in the various software packages necessary to complete these reviews, and to purchase licenses to each of those software packages.  In the short term, Drainage Impact Analyses that utilize specialized software either could not be reviewed and would need to be put on hold or could only be reviewed in a limited way that does not involve utilizing the advanced modeling tools.  

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

_ Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any): N/A

Date

Agenda Item #

Action Taken

 

 

 

 

Location: N/A

Address (if applicable):

Precinct(s): Countywide

 

Fiscal and Personnel Summary

Service Name

N/A

 

FY 24

FY 25

Next 3 FYs

Incremental Expenditures (do NOT write values in thousands or millions)

Labor Expenditures

$

$

$

Non-Labor Expenditures

$

$

$

Total Incremental Expenditures

$

$

$

Funding Sources (do NOT write values in thousands or millions)

Existing Budget

Choose an item.

$

$

$

Choose an item.

$

$

$

Choose an item.

$

$

$

Total Current Budget

$

$

$

Additional Budget Requested

Choose an item.

$

$

$

Choose an item.

$

$

$

Choose an item.

$

$

$

Total Additional Budget Requested

$

$

$

Total Funding Sources

$

$

$

Personnel (Fill out section only if requesting new PCNs)

Current Position Count for Service

-

-

-

Additional Positions Requested

-

-

-

Total Personnel

-

-

-

 

Anticipated Court Date: January 30, 2024

Anticipated Implementation Date (if different from Court date):

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

Attachments (if applicable): Map