File #: 26-1637    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 3/3/2026 In control: Commissioners Court
On agenda: 3/19/2026 Final action: 3/19/2026
Title: Request for approval of a change in contract with Precise Services Inc., in connection with Cedar Bayou Park East and West Subdivision Drainage Improvements - 2018, adding 19 calendar days, with an addition in the amount of $441,341.63, Job No. 24/0408-1, Bond Fund, UPIN 19102MF15W01, Precinct 2, MWBE Contracted Goal: 22.81%, MWBE Current Participation: 100%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 24/0408, UPIN 19102MF15W01

Vendor/Entity Legal Name (if applicable): Precise Services Inc.

 

MWBE Contracted Goal (if applicable): 22.81%

MWBE Current Participation (if applicable): 100%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Precise Services Inc., in connection with Cedar Bayou Park East and West Subdivision Drainage Improvements - 2018, adding 19 calendar days, with an addition in the amount of $441,341.63, Job No. 24/0408-1, Bond Fund, UPIN 19102MF15W01, Precinct 2, MWBE Contracted Goal: 22.81%, MWBE Current Participation: 100%.

end

 

Background and Discussion:

This project entails the construction of storm sewer drainage to convey drainage in the Cedar Bayou Park East

and West Subdivision from Sjolander Road to Bayou Boulevard.

 

The change in contract includes the following:

 

Added new line items to the bid items of the project for completion of the proposed scope of work.

 

•         Added new line item 125 for flowable fill for culverts - (RFI-53/PCO-14) for an addition in the amount of $81,900.00 and 10 days.

•         Added new line item 126 for temporary driveway access - (RFI-64/PCO-15) for an addition in the amount of $199,947.85 and 0 days.

•         Added new line item 127 for construction entrance/exit - (RFI-71/PCO-16) for an addition in the amount of $5,600.00 and 0 days.

•         Added new line item 128 for waterline relocation at Sjolander and Archer Rd - (RFI-72/PCO-17) for an addition in the amount of $54,701.36 and 5 days.

•         Added new line item 131 for Sanitary Repair Due to Bore Deflection - (RFI-80/PCO-19) for an addition in the amount of $65,583.50 and 4 days.

•         Added new line item 132 for Flashing Lights for Traffic Barrels - (RFI-73/PCO-20) for an addition in the amount of $8,000.00 and 0 days.

•         Added new line item 133 for Water-Filled Jersey Barriers - (RFI-73/PCO-20) for an addition in the amount of $19,200.00 and 0 days.

•         Added new line item 134 for Collar for 6x3 RCB & CP Conflict - (RFI-84/PCO-21) for an addition in the amount of $6,408.92 and 0 days.

 

The above additions and deductions result in a net change in the amount of $441,341.63 and 19 calendar days.

 

The County issued the Project’s Notice to Proceed on 06/02/2025. Per Attachment M of the Contract, the work was to be completed within 240 days of the Notice to Proceed, or by 01/28/2026. With this and all other prior approved change orders, the work is to be completed within 259 days of the Notice to Proceed, or by 02/16/2026.

 

Expected Impact:

This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in Cedar Bayou Park subdivision.

 

Alternative Options:

The County could elect to fund the requested task or choose to reject it. However, if not approved, the contractor will not be able to complete the scope of work.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

04/04/2023

228 (23-1874)

Contract Award - Serco Construction Group, Ltd.

04/23/2024

70 (24-2218)

Contract Amendment (23/0042-1) for additional funds and extension of project term

04/23/2024

379 (24-2461)

Contract Termination - Serco Construction Group, Ltd.

08/27/2024

65 (24-5080)

Contract Amendment (23/0042-2) for additional funds

08/27/2024

55 (24-5071)

Contract Amendment (23/0042-3) for additional funds

12/10/2024

524 (24-7523)

Transmittal - Advertisement

01/23/2025

157 (25-0443)

Contract Award - Precise Services, Inc.

06/12/2025

58 (25-3360)

Contract Amendment (23/0042-4) for a deduction in funds - Final with Serco Construction Group, Ltd.

 

Location: Cedar Bayou Park subdivision, Houston, TX

Address (if applicable): N/A

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1080 - Infrastructure Fund

$

$441,341.63

$441,341.63

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$441,341.63

$441,341.63

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$441,341.63

$441,341.63

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 03/19/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): Change in Contract (CIC)