Legislation Details

File #: 26-7803    Version: 1 Name:
Type: Transmittal Status: Agenda Ready
File created: 11/12/2026 In control: Commissioners Court
On agenda: 12/3/2026 Final action:
Title: Transmittal by the Office of the County Engineer of a Substantial Completion Certificate with CE Barker, LTD, for Service in connection with Sanitary Sewer System Construction - Westfield Estates - 2023, Job No. 24/0313, UPIN 23208MF2XZ01, Precinct 2.
Sponsors: Mony Hossain
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Transmittal

 

Project ID (if applicable): Job No. 24/0313, UPIN 23208MF2XZ01

Vendor/Entity Legal Name (if applicable): CE Barker, LTD

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

                     

Request Summary (Agenda Caption):

title

Transmittal by the Office of the County Engineer of a Substantial Completion Certificate with CE Barker, LTD, for Service in connection with Sanitary Sewer System Construction - Westfield Estates - 2023, Job No. 24/0313, UPIN 23208MF2XZ01, Precinct 2.                                                               

end

 

Background and Discussion:

Harris County Office of the County Engineer received American Rescue Plan Act (ARPA) funding for wastewater and water projects.  Through a vetting process, the Westfield Estates Sanitary Sewer System project was selected.  The project scope includes sanitary sewer lines, manholes, a lift station and a force main, as well as connecting properties to the new system and abandoning existing septic systems.  This initiative addresses environmental concerns by replacing failing septic systems that risk contaminating roadside ditches and nearby waterways.

 

The Substantial Completion Certificate provides documentation that a capital improvement project meets the qualifications of Substantial Completion in accordance with the Contract Documents as determined by the County Engineer.  Substantial Completion establishes the date on which capital improvement enters service as a Harris County asset.  The establishment and reporting of this date are important for all governmental entities as outlined in the GASB Statement #34, Capital Assets & Depreciation Guidance, August 31, 2001.  These certificates provide a method by which Harris County may document and record this date.

 

Expected Impact:

This action establishes the date on which a capital improvement enters service as a Harris County asset.

 

Alternative Options:

No alternative options:

 

Impact to project schedule: Substantial Completion date is 10/30/2026.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

10/29/2024

20 (24-6859)

Contract Award

02/12/2026

31 (26-0930)

Contract Amendment for additional funds & extension of project term

02/12/2026

32 (26-0932)

Contract Amendment for additional funds

06/11/2026

34 (26-3584)

Contract Amendment for additional funds

09/17/2026

49 (26-5745)

Contract Amendment for additional funds

10/15/2026

33 (26-6525)

Contract Amendment for additional funds

 

Location:

Address (if applicable): Westfield Estates Subdivision

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

2651 - American Rescue Plan 2021

$

          $

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 12/3/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B