Legislation Details

File #: 25-6735    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 10/15/2025 In control: Commissioners Court
On agenda: 10/30/2025 Final action: 10/30/2025
Title: Request for approval of an amendment to an agreement with Binkley & Barfield, Inc., in the amount of $428,707.00 for Professional Engineering Services in connection with Seamist Drive - W 11th Street to Kury Lane - 2023, UPIN 24104MF38301, Precinct 4, MWBE Contracted Goal: 4.2%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 4

Secondary Department Head/Elected Official: Lesley Briones

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): UPIN 24104MF38301

Vendor/Entity Legal Name (if applicable): Binkley & Barfield Inc

 

MWBE Contracted Goal (if applicable): 4.2%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of an amendment to an agreement with Binkley & Barfield, Inc., in the amount of $428,707.00 for Professional Engineering Services in connection with Seamist Drive - W 11th Street to Kury Lane - 2023, UPIN 24104MF38301, Precinct 4, MWBE Contracted Goal: 4.2%.

end

 

Background and Discussion:

The Seamist Drive I project includes roadway improvements that consist of a typical section of a concrete curb and gutter two-lane road with two 12-foot drive, drainage improvements that provides inline detention storage, public utility improvements including water line and sanitary sewer replacements, street lighting, landscaping and planting additional trees, and a safe pedestrian crossing along both sides of Seamist Drive, between 11th Street and Kurry Lane. This amendment will provide Professional Services to support extending the improvement and safety to meet the current requirement from Kurry Lane to 18th Street.

 

Expected Impact:

This project seeks to improve transportation and drainage systems and strengthen resiliency in Harris County by assisting in the alleviation of structures in the clay road area.

 

 

 

 

Alternative Options:

If no action is taken, the safety and mobility benefits associated with the proposed improvements will not be achieved, thereby depriving residents and pedestrians of the enhancements these improvements are intended to provide

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: G: Expand and optimize multimodal transportation options.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  G2: Implement designated corridors (e.g., HOV, BRT, truck lanes) in road design.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

12/19/2023

103 (23-7375)

Authorization to Negotiate for Engineering Services

06/26/2025

25-3890

Professional Service Agreement

 

Location: Houston, TX

Address (if applicable): N/A

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget (3109)

 

 

 

 

Other

$

$428,707.00

$428,707.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$428,707.00

$428,707.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$428,707.00

$428,707.00

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 10/30/2025

 

Anticipated Implementation Date (if different from Court date): N/A Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Senior Director of Capital Project Infrastructure, Office of the County Engineer

 

Attachments (if applicable): Professional Services Amendment