Harris County Logo
File #: 25-2427    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 4/4/2025 In control: Commissioners Court
On agenda: 4/16/2025 Final action: 4/16/2025
Title: Request for approval of an award on the basis of low bid to AJB Construction, Inc. in the amount of $455,536 for construction of covered parking replacement - Cypress Camp for Precinct 3, and for the County Clerk to execute any applicable bonds to be received (240418), MWBE Contracted Goal: 10%.

Primary Department: Purchasing

Primary Department Head/Elected Official: Paige McInnis

 

Secondary Department: Commissioner, Precinct 3

Secondary Department Head/Elected Official: Tom Ramsey

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): 240418

Vendor/Entity Legal Name (if applicable): AJB Construction, Inc.

 

MWBE Contracted Goal (if applicable): 10%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable):

Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

 

Request Summary (Agenda Caption):

title

Request for approval of an award on the basis of low bid to AJB Construction, Inc. in the amount of $455,536 for construction of covered parking replacement - Cypress Camp for Precinct 3, and for the County Clerk to execute any applicable bonds to be received (240418), MWBE Contracted Goal: 10%.

end

 

Background and Discussion: At the Harris County Cypress Service Center (aka Cypress Camp), there are several structures which house maintenance equipment/materials for infrastructure throughout Precinct 3. During Beryl, a large tree fell on the existing covered equipment yard structure used for fleet services and housing equipment and materials, destroying it. The structure has since been demolished and removed as it was deemed unstable and unsafe, leaving the equipment exposed to the elements. It is crucial to replace the structure immediately as the fleet vehicles and service trucks have no protection from the elements.

 

Expected Impact: Extended exposure will have several negative consequences, including damage to paint and finish and degradation of parts. Extreme heat will affect battery performance, electrical components and fluids, causing increased costs in maintenance and decreased lifespan

 

Alternative Options: N/A

 

 

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H4: Consistently embed sustainability considerations in the project planning and design process.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

01/09/2025

333

Transmittal by Purchasing of a project scheduled for advertising

 

Location:

Address (if applicable): 15530 Huffmeister Road, Cypress, TX 77429

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Bonds

$

$455,536.00

$455,536.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$455,536.00

$455,536.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$455,536.00

$455,536.00

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 4/16/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Disaster Recovery related item

 

Contact(s) name, title, department: Debjani Chakravarty, Director PMO & Contracts ;Dr. Ronald Lerner, DBA, MScE, IAEng, LSSBB, Director-Capital Projects Vertical Design & Construction, Harris County Engineering Department; Maria Heinzmann, Senior Buyer, Harris County Purchasing

 

Attachments (if applicable): Letter