Legislation Details

File #: 25-7757    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 11/24/2025 In control: Commissioners Court
On agenda: 12/11/2025 Final action: 12/11/2025
Title: Request for approval of a change in contract with Reliance Construction Services, LP in connection with final construction of Sanitary Sewer System Construction - Mercer Botanic Gardens - 2022, adding 55 calendar days, with an addition in the amount of $43,622.83, Job No. 23/0407-1, UPIN 23103MF2RQ01, Precinct 3, MWBE Contracted Goal: 23%, MWBE Current Participation: 100%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 23/0407, UPIN 23103MF2RQ01

Vendor/Entity Legal Name (if applicable): Reliance Construction Services, LP

 

MWBE Contracted Goal (if applicable): 23%

MWBE Current Participation (if applicable): 100%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): Not Applicable

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Reliance Construction Services, LP in connection with final construction of Sanitary Sewer System Construction - Mercer Botanic Gardens - 2022, adding 55 calendar days, with an addition in the amount of $43,622.83, Job No. 23/0407-1, UPIN 23103MF2RQ01, Precinct 3, MWBE Contracted Goal: 23%, MWBE Current Participation: 100%.

end

 

Background and Discussion:

The Sanitary Sewer System Construction project at Mercer Botanic Gardens scope included installation of new sanitary sewer lines, manholes, and decommissioning of existing septic systems to support infrastructure improvements at the facility.

During the course of construction, field conditions and design clarifications required adjustments to quantities and methods, resulting in Change Order No. 23/0407-1. This change order added $43,622.83 to the contract and extended the duration by 293 calendar days. All work was substantially completed by April 17, 2025, and final inspection confirms the project was completed in accordance with contract documents.

 

Expected Impact:

The completion of this project ensures the Mercer Botanic Gardens facility is now served by a code-compliant sanitary sewer system, replacing outdated septic infrastructure. This upgrade will improve environmental compliance, reduce maintenance needs, and support future site development and public use without the risk of system failures.

Alternative Options:

There are no practical alternatives to approving the final payment. The work has been completed, inspected, and certified in accordance with contract requirements.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

01/09/2024

202 (24-0207)

Contract Award

 

Location:

Address (if applicable): 22306 Aldine Westfield Rd, Humble, TX 77338

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3269

$

$43,622.83

$43,622.83

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$43,622.83

$43,622.83

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$43,622.83

$43,622.83

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 12/11/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer.

 

Attachments (if applicable): County Auditor’s Form 1258B