Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 21/0280
Vendor/Entity Legal Name (if applicable): Serco Construction Group, Ltd
MWDBE Contracted Goal (if applicable): 15%
MWDBE Current Participation (if applicable): 100%
Justification for 0% MWDBE Participation Goal: N/A - Goal is not 0% and is listed above
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Serco Construction Group, Ltd, in connection with final construction of L512-01-00-E005 (Kleb Woods Stormwater Detention Basin) Phase ll - 2020, adding 52 calendar days, with an addition in the amount of $174,982.70, Job No. 21/0280-2, UPIN 21103MF1X101, Precinct 4, MWDBE Contracted Goal: 15%, MWDBE Current Participation: 100%.
end
Background and Discussion:
This project is for the construction of the Phase 2 Basin for the ultimate Kleb Woods Detention Basin.
This change order provides the following changes:
1. Final Adjustments to existing items totaling a sum of $174,982.70 for overruns of bid items during the course of construction.
2. Addition of 52 days for:
a. Time for Harris County Flood Control District to conduct their inspection and provide feedback to the contractor for final grade adjustments.
b. Time beyond the contractors control due to water being pumped into our work zone basin by an adjoining project being managed by Harris County Flood Control District. The excessive water caused delays and weeks of pumping to get the water removed from the job site.
Expected Impact:
The approval of the final change order will allow for final payment of the contract and closing of the Purchase Order.
Alternative Options:
Failure to approve the Final Change Order could cause the County to be in default to a contractor and leave room for a possible suit against the county for work already performed.
Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
X Transportation
_ Flooding
_ Environment
_ Governance and Customer Service
Prior Court Action (if any):
Date |
Agenda Item # |
Action Taken |
10/26/2021 |
256 |
Contract Award |
06/27/2021 |
52 |
Contract Amendment for additional funds and extension of project term |
Location:
Address (if applicable):
Precinct(s): Precinct 4
Fiscal and Personnel Summary |
Service Name |
|
|
FY 24 |
FY 25 |
Next 3 FYs |
Incremental Expenditures (do NOT write values in thousands or millions) |
Labor Expenditures |
$ |
$ |
$ |
Non-Labor Expenditures |
$174,982.70 |
$ |
$ |
Total Incremental Expenditures |
$174,982.70 |
$ |
$ |
Funding Sources (do NOT write values in thousands or millions) |
Existing Budget |
Other |
$174,982.70 |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
Total Current Budget |
$174,982.70 |
$ |
$ |
Additional Budget Requested |
Choose an item. |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
Total Additional Budget Requested |
$ |
$ |
$ |
Total Funding Sources |
$174,982.70 |
$ |
$ |
Personnel (Fill out section only if requesting new PCNs) |
Current Position Count for Service |
- |
- |
- |
Additional Positions Requested |
- |
- |
- |
Total Personnel |
- |
- |
- |
Anticipated Court Date: November 14, 2023
Anticipated Implementation Date (if different from Court date):
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Dr. Hatem Bastawisy, PE, (Interim) Senior Director of Project Delivery, Harris County Engineering Department
Attachments (if applicable): County Auditor’s Form 1258B