Title: Request for approval to execute an agreement with R.G. Miller Engineers, Inc. in the amount of $1,477,193.10 for Professional Engineering Services in connection with the design of Road Improvements - Garth Rd 2 South of Sterling Summer Dr to Ashbel Cove Dr - 2024, UPIN 24103MF3GA01, Precinct 3, MWBE Contracted Goal: 19.60%.
Attachments: 1. 25-1594-Award-UPIN 24103MF3GA01-R G Miller-Professional Engineering- Garth Roal 2 South of Stearling

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): UPIN 24103MF3GA01

Vendor/Entity Legal Name (if applicable): R.G. Miller Engineers, Inc.

 

MWBE Contracted Goal (if applicable): 19.60%

MWBE Current Participation (if applicable): 0%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an agreement with R.G. Miller Engineers, Inc. in the amount of $1,477,193.10 for Professional Engineering Services in connection with the design of Road Improvements - Garth Rd 2 South of Sterling Summer Dr to Ashbel Cove Dr - 2024, UPIN 24103MF3GA01, Precinct 3, MWBE Contracted Goal: 19.60%.

end

 

Background and Discussion:

The project is located in east Harris County, north of I-10.  The existing Garth Road configuration in the project area ( South of Sterling Summer Dr to Ashbel Cove Dr) is a 2-lane asphalt roadway with roadside ditches with a 2-lane bridge with no shoulder or sidewalk over the Coastal Water Authority raw water canal.  The goal of the project is to design and construct a standard 4-lane concrete boulevard with curb and gutter and to widen the canal crossing bridge to 4-lanes with pedestrian sidewalk.

 

Expected Impact:

 

The proposed project will increase the traffic capacity for the active development in this area, as well as improve driver safety at the intersection with FM 1942.  The project is funded by 2022 Bond funds.

 

 

 

 

Alternative Options:

 

Without this project, the new road improvements on Garth Road will not be realized as requested by Precinct

3.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

6/25/2024

24-3611

Approval to negotiate with R. G. Miller for professional engineering services in connection with Road Improvements - Garth Rd 2 South of Sterling Summer Dr to Ashbel Cove Dr - 2024, UPIN 24103MF3GA01, Precinct 3.

 

Location: Garth Road

Address (if applicable):  Garth Road South of Sterling Summer Dr to Ashbel Cove Dr

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$1,477,193.10

$1,477,193.10

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$1,477,193.10

$1,477,193.10

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

1070 - Mobility Fund

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$1,477,193.10

$1,477,193.10

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 3/27/2025

 

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

 

Attachments (if applicable): Professional Services Agreement