Legislation Details

File #: 26-7851    Version: 1 Name:
Type: Contract - Amendment Status: Agenda Ready
File created: 11/13/2026 In control: Commissioners Court
On agenda: 12/3/2026 Final action:
Title: Request for approval of amendment No. 1 to an agreement with Lockwood, Andrews & Newnam, Inc., in the amount of $41,173.67, to provide design, bidding, and construction phase engineering services in support of the Lauder Stormwater Detention Basin Phase 2 Compartment 2 on HCFCD Unit P500-06-00 (Greens Bayou Watershed, Bond ID C-34, Project ID P500-06-00-E007, CDBG-DR, Agreement No. 2024-68, Precinct 2, MWBE Contracted Goal: 19.84%, MWBE Current Participation: 20.88%).
Attachments: 1. 120326 AMEND LAN 2024-68 PCT 2 backup.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Primary Department: Flood Control District

Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM, Executive Director

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): N/A

Vendor/Entity Legal Name (if applicable): N/A

 

MWBE Contracted Goal (if applicable): 19.84%

MWBE Current Participation (if applicable): 20.88%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of amendment No. 1 to an agreement with Lockwood, Andrews & Newnam, Inc., in the amount of $41,173.67, to provide design, bidding, and construction phase engineering services in support of the Lauder Stormwater Detention Basin Phase 2 Compartment 2 on HCFCD Unit P500-06-00 (Greens Bayou Watershed, Bond ID C-34, Project ID P500-06-00-E007, CDBG-DR, Agreement No. 2024-68, Precinct 2, MWBE Contracted Goal: 19.84%, MWBE Current Participation: 20.88%).

end

 

Background and Discussion:

This amendment is required to provide post-construction survey services needed as per the requirements of the District’s Surveying Guidelines and for the successful completion of project construction. This project is a component of the Greens Bayou Mid Reach project intended to mitigate flooding in the watershed. Construction of the Lauder SWDB - Phase 1 was completed in February 2022 under Project ID P500-06-00-E005 and construction of Lauder SWDB - Phase 2, Compartment 1 was completed in March 2025 under Project ID P500-06-00-E006. This project includes construction of the Lauder SWDB - Phase 2, Compartment 2 with the project site being approximately 48 acres of land adjacent to the Greens Bayou. The proposed Compartment 2 will be connected to the existing Compartment 1 with a 72-inch Reinforced Concrete Pipe (RCP) connector pipe through the Sunoco easement. Project is being funded by the 2018 Bond and CDBG-DR program. The Flood Control District will construct the project using funding from the CDBG-DR grant program.

 

Expected Impact:

The project seeks to reduce flood risks and strengthen resiliency in the Greens Bayou watershed by reducing water surface elevations, providing 262 acre-feet of detention, mitigating future conveyance improvements for tributary channel P138-00-00 and provides a 10-year level of service. The project alone provides interim benefits and reduces flood risks to 29 structures during the 100-year storm event.

Alternative Options:

No Action Alternative would fail to meet the purpose and needs of mitigating flood risk and provide additional system capacity for this Community Development Block Grant Disaster Recovery (CDBG-DR) funded project. Under the No action alternative, area residents would continue to be affected by area flooding.

 

County Strategic Plan Goal:  5. Minimize the impact of climate change and disasters.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H1: Complete and implement the Flood Resilience Plan.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

10/29/2024

147.

Agreement

 

Location: N/A

Address (if applicable):

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

4.a.3 - Engineering Services

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Bonds

$

$41,173.67

$41,173.67

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$41,173.67

$41,173.67

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$41,173.67

$41,173.67

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 12/3/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Agreement