Title: Request for approval of a Final Investment Memo for the Tracy Gee Community Center Renovation project, for an incremental amount of $1,775,000.00, and request for approval of commercial paper funding in the amount of $2,100,000.00, including an authorization and allocation transfer from the Precinct 4 HQ Furniture project in the amount of $225,000.00, for a total authorization and allocation of $19,775,000.00.
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Primary Department: Commissioner, Precinct 4

Primary Department Head/Elected Official: Commissioner Lesley Briones

Managing Department: Commissioner, Precinct 4

Managing Department Head/Elected Official: Commissioner Lesley Briones

Regular or Supplemental RCA: Regular RCA

Type of Request: Investment Memo

Investment Memo Type: Final Investment Memo

 

Project Name: Tracy Gee Community Center Renovation

Project ID (if applicable): MF3BB

Vendor Legal Name (if applicable): N/A

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Achievement (if applicable): N/A

Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable):

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Incremental Authorization Requested: $1,775,000.00

Total Estimated Project Cost: $19,775,000.00

 

Request Summary:

title

Request for approval of a Final Investment Memo for the Tracy Gee Community Center Renovation project, for an incremental amount of $1,775,000.00, and request for approval of commercial paper funding in the amount of $2,100,000.00, including an authorization and allocation transfer from the Precinct 4 HQ Furniture project in the amount of $225,000.00, for a total authorization and allocation of $19,775,000.00.

end

 

Project Description:

The existing Tracy Gee Community Center, located at 3599 Westcenter Drive, is one of seven community centers located within Precinct 4. The existing building, constructed in 1983 and last renovated in 1996/97, is approximately 20,000 square feet in floor area. The current request is for detailed designs to address the issues identified in the previous schematic design phase.

During the previous schematic design phase, Precinct 4 engaged STOA Architects to complete a Building and Site Assessment report for the facility, below are the key findings from the report.

                     The existing structural floor slab lacks adequate steel reinforcement and interior grade beams, resulting in the building’s foundation to be sloped.

                     There is inadequate lateral bracing in the building superstructure, affecting the structure’s wind resistance. If sufficiently strong wind were to occur, such as during a hurricane, the building structure may collapse.

                     Currently the building lacks a fire sprinkler system, in violation of current building codes.

                     There are over 40 ADA code violations noted in the building. Remediating these violations requires extensive and intrusive remodeling of all the building’s walls and doors.

                     Many mechanical and electrical code violations exist in the building, including electrical switch gear and the facility’s hot water heater being located within the same room.

In addition to the issues uncovered during the assessment report, additional operational and functional exist.

                     The layout of the existing building consists of many small rooms, greatly limiting the services and activities that can be provided by the Precinct 4 team to the community.

                     Many of the rooms and facilities in the building do not meet current service needs. For example, a weekly square dance class is one of the most popular activities hosted by Precinct 4 in the facility. However, the largest room in the building is not sufficiently large to accommodate demand nor is a dance floor provided for users.

                     There have been several instances of vehicles crashing into the front of the building due to confusing parking layout. The latest collision occurred in February 2024, causing extensive damage and rendering an activity room unusable. Another collision occurred in 2012 in the same location, also causing significant damage.

                     The existing Constable Precinct 5 office is only accessible from the exterior and is in poor condition compared to the rest of the building.

                     Extremely limited office space exists for Precinct 4 staff, requiring team members to share desks.

                     The current building cannot serve as a warming or cooling center during a power outage due to a lack of a whole building generator.

                     The existing parking lot and roadway circulation patterns do not permit the facility to function effectively as a food and water distribution site during storm events.

To rectify the deficiencies and shortcomings listed above, it was recommended in the assessment report to demolish and replace the Tracy Gee Community Center with a newly constructed facility.

The proposed replacement facility will meet the following goals and objectives:

                     Provide a revitalized community facility that is inviting and functional for all users, better aligning the spaces within the building to the services and activities provided by Precinct 4 plus provide allowances for additional services.

                     Provide enhanced and expanded space for a dedicated Harris County Constable Precinct 5 office plus provide a publicly accessible store front. The security infrastructure at the Tracy Gee Community Center is a critical investment to safeguard both the facility and its visitors.

                     Allow the facility to function as a cooling/heating center and food and water distribution site during emergency events such as hurricanes and winter storms.

Currently the tract of land the building is situated on is highly constrained, limiting potential building and parking area layouts. The Office of the County Engineer and the owner of 3603 Westcenter Drive have reached an agreement to sell this tract, increasing the land space available for a reimagined Community Center.  The additional land also allows for a more efficient building layout on the site, sufficient space to accommodate traffic queues that occur in conjunction with food and water distribution activities during major storm events and allows for the development of green space to benefit the users of the facility.

It is anticipated that the existing community center structure will need to be expanded from 20,000 square feet to 25,000 to 30,000 square feet to meet the goals and objectives listed above. The exact building square footage, layout, and furnishing requirements will be determined during the Schematic and Detailed Design phases of the project. Construction of the facility will be delivered through a Construction Manager at Risk (CMAR) method. This method engages the construction contractor during the design process, allowing them to provide input into the design while it is being developed. This engagement will help the project team to maintain the approved project budget and schedule, plus provide value engineering through the design process.

In Summary, this Investment Memo is requesting funding to complete the following activities.

                     Obtain a LEED certification to recognize our building as meeting the rigorous standards in sustainability, energy efficiency and environmental responsibility.

                     Completion of detailed design changes that will also affect the increase of construction costs to incorporate the LEED elements.

Anticipated Project Expenditures and Timeline:

Project Scope Breakdown

Estimated Cost

Estimated Completion

Schematic Design - Tracy Gee Community Center  (Previously Approved)

$400,000.00

March 2025

Detailed Design - Tracy Gee Community Center  (Previously Approved)

$1,500,000.00

December 2026

Construction Manager at Risk (CMAR) Management Fee - Tracy Gee Community Center (Previously Approved)

$300,000.00

December 2026

Land Purchase - 3603 Westcenter Drive (Previously Approved)

$1,800,000.00

May 2025

Environmental Consulting, Abatement, and Demolition of Existing Structure at 3603 Westcenter Drive (Previously Approved)

$400,000.00

December 2025

Tree Removal, Surveying and Re-Platting of Adjacent Property - Tracy Gee Community Center (Previously Approved)

$325,000.00

January 2026

Construction - Tracy Gee Community Center (Previously Approved)

$13,275,000.00

October 2026

Total - Previously Approved

$18,000,000.00

 

Incremental Authorization - This Investment Memo

$1,775,000.00

 

Grand Total

$19,775,000.00

 

 

Justification & Alternatives:

Replacement of the existing Community Center will help to better serve the needs of constituents. Increased level of services for constituents through improved recreational facilities, better tailored to the needs of the community. Improve quality of life for constituents through providing enhanced recreational services.

This project supports the following Priority Outcomes and/or Goal Areas:

                     Justice and Safety: Provide and implement comprehensive security measures to mitigate potential risks and ensure a secure environment for all events and activities, enhancing the center’s reputation as a safe and reliable venue as well as during disaster times.

                     Public Health: Mitigate potential health, safety and accessibility issues with the existing building.

                     Governance and Customer Service: Provide enhanced services to the community through facility improvements.

The success of the project can be measured through the following performance metrics:

                     Increased attendance by Precinct 4 residents at hosted activities and events.

                     The ability to function as a warming or cooling center during power outages and other emergencies.

                     Reduced energy consumption through efficient building envelopes, mechanical and electrical systems.

                     This project is the best solution for addressing the issues and deficiencies identified above. Neglecting this replacement would lead to further deterioration of the building's structural integrity, posing potential safety risks to the community.

The two potential alternatives are below:

1.                     Delaying the Project: Postponing this replacement for a year could exacerbate existing issues, increasing repair costs and potentially leading to more severe structural damage.

2.                     Not Doing the Project: Failing to renovate would continue to endanger public safety and limit community services, further diminishing the building's utility and value.

However, the impacts of either alternative are:

                     Structural Integrity: Without intervention, the building's condition will worsen, leading to a potential safety issue.

                     Community Services: Limited space will continue to restrict community programming and operations of the constable office.

                     Health and Safety: Precinct 4 does not possess a facility within the Alief area that can function as a cooling/heating center and food and water distribution site during storm events.

                     Health and Safety: The existing Constable Precinct 5 office is not public facing, disallowing the opportunity for residents to engage with this service in an effective manner.

Stakeholder Engagement: We will engage the following stakeholders:

                     Community Members: Ensuring their needs and concerns are addressed.

                     Constable Office: Facilitating their operational requirements.

                     Universal Services and Facilities & Property Maintenance: Collaborating with these departments to evaluate and approve the project.

By addressing these issues now, we can ensure the building remains safe, functional, and beneficial for the entire community.

Anticipated Impact on Other Funds (If Applicable):

Fund Code

Description

Estimated Cost

Funding Method  (Existing or Future Budget Request Required)

Estimated Date of Needs

 

 

$-

 

-

 

 

$-

 

-

Total

 

$-

 

-

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):   N/A

Infrastructure Initiative (Goal 2):  H4: Consistently embed sustainability considerations in the project planning and design process.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Previous Court Action:

Date

Agenda Item #

Action Taken

07/15/2024

24-4483

Approval of the Preliminary Investment Memo for the Tracy Gee Community Center Renovation project for an initial amount of $400,000.00 and request for approval of initial commercial paper funding in the amount of $400,000.00.

02/06/2025

25-0993

Request for approval of a Preliminary Investment Memo for the Tracy Gee Community Center Renovation project for an additional $1,800,000.00 for a total authorization of $2,200,000.00 and request for approval of commercial paper funding in the amount of $1,500,000.00 for a total allocation of $1,900,000.00

3/27/2025

25-1972

Request for approval of a Preliminary Investment Memo for the Tracy Gee Community Center Renovation for an additional amount of $1,800,000 for a total authorization of $4,000,000.00 and commercial paper funding in the amount of $1,800,00.00 for a total allocation of $3,700,000.00.

6/12/2025

25-3658

Request for approval of a Preliminary Investment Memo for the Tracy Gee Community Center Renovation for an additional amount of $400,000.00 for a total authorization of $4,400,000.00 and commercial paper funding in the amount of $700,000.00 for a total allocation of $4,400,000.00

9/18/2025

25-5924

Request for approval of a Preliminary Investment Memo for the Tracy Gee Community Center Renovation for an additional amount of $325,000.00 for a total authorization of $4,725,000.00

1/29/2026

26-0820

Request for approval of a Final Investment Memo for the Tracy Gee Community Center Renovation for an additional amount of $13,275,000.00

                     

Address: 3599 Westcenter Dr. Houston, TX 77042

Precinct(s): Precinct 4

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

 

 

 

 

 

Funding Sources

 

Existing Budget

 

 

 

 

Commercial Paper

$

$225,000.00

$225,000.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$225,000.00

$225,000.00

$

Additional Budget Request

 

Commercial Paper

$

$1,875,000.00

$1,875,000.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$1,875,000.00

$1,875,000.00

$

Total Funding Request

$

$2,100,000.00

$2,100,000.00

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 9/17/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

Legal funding compliance confirmed by: Sandra Staine, Senior Assistant County Attorney, 8/13/2026

Department Approval by: Jamaal Smith, Chief of Staff, Commissioner Precinct 4

OMB CIP Team Approval by: William McGuinness, Director-Capital Projects & Infrastructure, 8/13/2026

Commercial Paper Request (For OMB use only):

Receiving Department: Commissioner, Precinct 4

Project PeopleSoft ID: MF3BB

CP Series Description:

Commercial Paper Series D-3 can be used for (1) construction of public works, (2) the purchase of automobiles, equipment and machinery, including computers, materials and supplies for the operation of the County’s precincts and departments (3) Professional services, including services provided by engineers, architects, attorneys, auditors, financial advisors, and fiscal agents, in connection with the contractual obligations described in (1) and (2).

Commercial Paper is being requested for the Precinct 4 Tracy Gee Community Center Renovation project and is expected to be repaid within the next three fiscal years either through bonds, budgetary means or pay-as-you-go sources.

OMB Financial Management contact: Fahad Gulzar, Deputy Executive Director, Office of Management and Budget