Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM, Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official:
Regular or Supplemental RCA: Regular RCA
Type of Request: Grant - Award
Project ID (if applicable): D518-03-00-E002
Vendor/Entity Legal Name (if applicable): U.S. Environmental Protection Agency State and Tribal Assistance
MWBE Contracted Goal (if applicable):
MWBE Current Participation (if applicable):
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): 0%
Justification for 0% Grant Indirect Costs Rate (if applicable): HCFCD, HCTRA, HHS
Request Summary (Agenda Caption):
title
Request by the Flood Control District for approval to accept from the U.S. Environmental Protection Agency State and Tribal Assistance grant funds in the amount of $959,752, with a required match of $239,938, for the FY24 Community Project Funding for Keegans at Old Richmond Road Stormwater Detention Basin (Brays Bayou Watershed, Bond ID F-07, Project ID D518-03-00-E002, Precinct 4).
end
Background and Discussion:
It is recommended that the Flood Control District be authorized to accept the grant award funds from the Environmental Protection Agency (EPA) Fiscal Year 2024 Clean Water STAG (Congressionally Directed) Grant Program to fund the construction of the Keegans Bayou Drainage Improvements near Old Richmond Road Project (D518-03-00-E002) in the Brays Bayou Watershed. The proposed D518-03-00-E002 Keegans Bayou Drainage Improvements near Old Richmond Road project will further reduce flood risk in the Brays Bayou Watershed. The Flood Control District plans to source the required local cash match ($239,938) from the CDBG grant on the same project. Federal appropriations funding for this award was secured by Representative Lizzie Fletcher, Texas Congressional District 7.
Expected Impact:
The proposed Keegans Bayou Drainage Improvements project will further reduce flood risk in the Brays Bayou Watershed. The Flood Control District expects that this overall project will reduce the Atlas-14 100-year floodplain by approximately 300 acres, removing up to approximately 550 structures from the floodplain and, removing up to approximately 4 miles of roadway from the floodplain.
The Flood Control District will utilize its resources and applicable consultants during the design and construction phases of the project, as well as the management of the grant approval process in compliance with Harris County statutes, applicable laws of the state of Texas, and Policy regarding Federal Grant Awards.
Alternative Options:
The alternative would be not to accept this grant award. The Flood Control District would need to utilize a different funding source to pay for this project.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): N/A
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan:
This action is consistent with the Strategic Plan overarching goals of reducing the number of structures at risk of flooding and improving the quality of life of Harris County residents.
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
2/6/2025 |
164 |
Approval to apply |
Location: The D518-03-00-E002 Keegans Bayou Drainage Improvements near Old Richmond Road project is
located in the Brays Bayou watershed along Keegans Bayou near the confluence of D118-14-00 between Synott
Road and South Dairy Ashford. The project is within the incorporated City of Houston limits located in southwest
Harris County in Precinct 4.
Address (if applicable):
Precinct(s): Precinct 4
|
Fiscal and Personnel Summary |
|
Service Name |
N/A |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$ |
$ |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$ |
$ |
$ |
|
Grants - Proposed Budget |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Bonds |
$ |
$239,938 |
$239,938.00 |
1 Years |
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$959,752 |
$959,752.00 |
|
|
Personnel (Fill out section only if requesting new PCNs) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 7/9/2026
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District
Attachments (if applicable): Order, Award, Grant Budget Template