Legislation Details

File #: 26-2103    Version: 1 Name:
Type: Transmittal Status: Accepted
File created: 3/18/2026 In control: Commissioners Court
On agenda: 3/31/2026 Final action: 3/31/2026
Title: Transmittal by the Office of the Purchasing Agent of an award of a Community Development Block Grant Disaster Recovery (CDBG-DR)/Community Development Block Grant Mitigation (CDBG-MIT) Program(s) project on the basis of low bid(s) to Brice Construction & Design, LLC in the amount of $29,387,654 for channel conveyance improvements to Taylor Gully and Woodbridge Stormwater Detention Basin for the Flood Control District and for the County Clerk to execute any applicable bonds to be received (260025), MWBE Contracted Goal: 29.38%.

Primary Department: Purchasing

Primary Department Head/Elected Official: Kimberly J. Williams, JD

 

Secondary Department: Flood Control District

Secondary Department Head/Elected Official: Tina Petersen  

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Transmittal

 

Project ID (if applicable): 260025

Vendor/Entity Legal Name (if applicable): Brice Construction & Design, LLC

 

MWBE Contracted Goal (if applicable): 29.38%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable):

Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

 

Request Summary (Agenda Caption):

title

Transmittal by the Office of the Purchasing Agent of an award of a Community Development Block Grant Disaster Recovery (CDBG-DR)/Community Development Block Grant Mitigation (CDBG-MIT) Program(s) project on the basis of low bid(s) to Brice Construction & Design, LLC in the amount of $29,387,654 for channel conveyance improvements to Taylor Gully and Woodbridge Stormwater Detention Basin for the Flood Control District and for the County Clerk to execute any applicable bonds to be received (260025), MWBE Contracted Goal: 29.38%.

end

 

Background and Discussion:

The Taylor Gully Channel is in the north-eastern part of Harris County, Texas. The project limits of the proposed Taylor Gully Channel Improvements stretch from the Montgomery County boundary on the west to approximately 700 feet upstream of the confluence with White Oak Creek (G103-80-03.1) for a total length of approximately 12,630 linear feet. Additionally, there are two adjacent Flood Control owned properties (Woodridge site G503-06-00) in Montgomery County that are designated for stormwater detention and for mitigation of impacts from the channel improvements. Except for the two detention basins, the project is within the City of Houston limits.

The project consists of approximately 12,630 linear feet channel conveyance improvements of Taylor Gully Channel, construction of a detention basin to mitigate the channel improvement and design of a new simple span vehicular bridge over the channel. This item is requested so that we may have the selected contractor begin the construction for the improvements. The prioritization framework score for this project is 4.0.

 

Expected Impact:

This agreement will allow HCFCD to begin construction. The project seeks to reduce flood risks and strengthen resiliency in the San Jacinto watershed by achieving 100- channel level of service by improving Taylor Gully HCFCD Unit G103-80-03.1. The overall benefit of this project would be a substantial reduction in WSE along Taylor Gully Channel. There would be a maximum reduction in WSE of 6.9 feet and an average reduction of 4 to 5 feet for the 100-year storm event. Also, this project will remove approximately 276 structures from a 100-year flood plain.

 

Alternative Options:

No Action Alternative would fail to meet the purpose and needs of mitigating flood risk and provide additional system capacity for this Community Development Block Grant Disaster Mitigation (CDBG-MIT) funded project. Under the No action alternative, area residents would continue to be affected by area flooding.

 

County Strategic Plan Goal:  5. Minimize the impact of climate change and disasters.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H1: Complete and implement the Flood Resilience Plan.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

01/08/2026

 

Approval to delegate authority to the Harris County Purchasing Agent to award construction contracts to the lowest responsible bidder for 29 identified flood control District projects, funded by the CDBG-Dr and CDBG-MIT programs

01/08/2026

 

Transmittal by the Flood Control District of the executed amendment to the agreement with the Texas General Land Office (GLO), to approve seven additional projects for the CDBG-MIT Program (GLO Contract No. 24-064-000-E151).

02/12/2026

250

Transmittal by Purchasing of a project scheduled for advertising.

 

Location:

Address (if applicable): N/A

Precinct(s): Choose an item.

 

 

 

Fiscal and Personnel Summary

Service Name

4.a.2 - Construction Services 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Grant

$

$29,387,654.00

29,387,654.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$29,387,654.00

$29,387,654.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$29,387,654.00

$29,387,654.00

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 3/31/2026

 

Anticipated Implementation Date (if different from Court date): 5/18/2026

 

Emergency/Disaster Recovery Note: Disaster Recovery related item

 

Contact(s) name, title, department: Melissa Meyer, CDBG/MIT - DR Deputy Program Director, Engineering Division; Maria Heinzmann, Senior Buyer, Harris County Purchasing

 

Attachments (if applicable): Letter