Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: Commissioner, Precinct 3
Secondary Department Head/Elected Official: Tom S. Ramsey, P.E.
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 24/0415, UPIN 19103MF14A01
Vendor/Entity Legal Name (if applicable): Environmental Allies Inc.
MWBE Contracted Goal (if applicable): 20.21%
MWBE Current Participation (if applicable): 24.75%
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Environmental Allies Inc., in connection with final construction of Dowdell Woods Subdivision Drainage Improvements, adding 11 calendar days, with a deduction in the amount of $382,162.62, Job No. 24/0415-4, UPIN 19103MF14A01, Precinct 3, MWBE Contracted Goal: 20.21%, MWBE Current Participation: 24.75%.
end
Background and Discussion:
This project is in Northwest Harris County in both the White Oak Bayou and Cypress Creek watersheds. It is west of N. Eldridge Parkway and north of Cypress North Houston Road. The drainage system is currently roadside ditches. The proposed improvements are to regrade the roadside ditches, install a storm sewer system below the ditches, and connect to the K500-01-00 detention basin expansion project for mitigation on this project.
The change in contract includes the following:
The line items are adjusted to reconcile overrun, underrun quantities and add new line items on the project for completion of the proposed scope of work.
• The increase in quantities on overrun of existing line-item numbers 4, 5, 8, 16, 18, 21, 25, 29, 36, 55, 76, 85, 86 and 87 for an addition in the amount of $121,833.51.
• The decrease of quantities on underrun of existing line item numbers 3, 6, 7, 10, 14, 15, 19, 20, 22, 23, 27, 28, 30, 43, 46, 47, 49, 50, 51, 52, 53, 56, 58, 61, 62, 63, 64, 65, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 78, 79, 80, 81, 82, 83, 84, 88, 95, 96, and 200 for a deduction in the amount of $543,624.79.
New Line Items:
• Added new line item 98 - Brick mailbox remove and reinstallation for an addition in the amount of $16, 523.36 and zero (0) days.
• Added new line item 99 - Special gravel driveway for an addition in the amount of $3,518.20 and zero (0) days.
• Added new line item 100 - Installation of APRON AROUND UNPROTECTED INLETS IN GRASS LINES DITCH for an addition in the amount of $3,006.00 and zero (0) days.
• Added new line item 101 - INSTALLATION OF NEW INLET STRUCTURE AND CONNECTIGN IT TO THE EXISITING junction Boxes (JB) for an addition in the amount of $16,581.10 and zero (0) days.
• Added Eleven (11) additional days for change in stabilization and construction methodology for the entrance of the subdivision along William Dowdell Drive.
The above additions and deductions result in a deduction in the amount of $382,162.62 and eleven (11) calendar days.
Expected Impact:
This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the Dowdell Woods subdivision.
Alternative Options:
The County could elect to fund the requested task or choose to reject it. However, if not approved, the contractor will not be compensated for completing the scope of work.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): H6: Expand neighborhood drainage programs.
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: N/A
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
01/09/2025 |
348 (25-0210) |
Transmittal - Advertisement |
|
01/23/2025 |
162 (25-0502) |
Contract Award - Environmental Allies, LLC |
|
08/26/2025 |
40 (25-5141) |
Contract Amendment (24/0415-1) for additional funds |
|
11/13/2025 |
31 (25-7054) |
Contract Amendment (24/0415-2) for additional funds |
|
01/08/2026 |
48 (26-0200) |
Contract Amendment (24-0415-3) for extension of project term |
|
04/30/2026 |
87 (26-2664) |
Transmittal - Substantial Completion Certificate |
Location: Dowdell Woods Subdivision
Address (if applicable): N/A
Precinct(s): Precinct 3
|
Fiscal and Personnel Summary |
|
Service Name |
Engineering |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Grant 2601 |
$ |
-$382,162.62 |
-$382,162.62 |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
-$382,162.62 |
-$382,162.62 |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
-$382,162.62 |
-$382,162.62 |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 11/12/2026
Anticipated Implementation Date (if different from Court date): N/A
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer
Attachments (if applicable): Change in Contract (CIC) - Final