File #: 25-1827    Version: 1 Name:
Type: Grant Status: Passed
File created: 3/13/2025 In control: Commissioners Court
On agenda: 3/27/2025 Final action: 3/27/2025
Title: Request by the Office of the County Engineer for approval to submit an application to the United States Department of Transportation (USDOT) for grant funds in the amount of $5,000,000, with no required match, for the FY 2025 Better Utilizing Investments to Leverage Development (BUILD) Grant Program (East Side Rail Crossing Improvement Study, Precinct 2).
Attachments: 1. FINAL Backup PCT2- Study_BUILD FY-25.pdf

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official:

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Grant - Application

 

Project ID (if applicable): N/A

Vendor/Entity Legal Name (if applicable): N/A

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request by the Office of the County Engineer for approval to submit an application to the United States Department of Transportation (USDOT) for grant funds in the amount of $5,000,000, with no required match, for the FY 2025 Better Utilizing Investments to Leverage Development (BUILD) Grant Program (East Side Rail Crossing Improvement Study, Precinct 2).

end

 

Background and Discussion:

 The Precinct 2 East Side Rail Crossing Improvement Study aims to enhance rail crossing safety while addressing key criteria such as safety, environmental sustainability, quality of life, mobility, community connectivity, economic competitiveness, state of good repair, collaboration, and innovation. The application requests $5,000,000 in federal funding, allocating $2,500,000 for the planning phase of each project location-Broadway Blvd. Rail Crossing and Market Street Rail Crossing. Since these study areas are located in regions of persistent poverty, no local match should be required for the planning phase.

 

Expected Impact:

The project is expected to conduct planning to improve rail crossing safety not only at the two study locations but also at other crossings nearby in Harris County Precinct 2.

 

Alternative Options:

 

To not apply for the FY 2025 BUILD Grant and pursue the proposed project with local funding.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):   N/A

Infrastructure Initiative (Goal 2):  F2: Improve data collection, utilization, and availability to drive better transportation safety decision-making.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any): N/A

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

Address (if applicable):

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

FY 2025 Better Utilizing Investments to Leverage Development (BUILD) Grant Program

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$0

   2 - Years

Grant Funds Applied for/Awarded (Total)

$

$

$5,000,000

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 3/27/2025

Anticipated Implementation Date (if different from Court date): 9/1/2026

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Patrick Mandapaka, PhD, AICP, Director of Community Planning and Transportation, Harris County Engineering Department

 

Attachments (if applicable): Letter of Funding Commitment, FY-25 Project Budget, and Project Description