Legislation Details

File #: 25-0352    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 12/27/2024 In control: Commissioners Court
On agenda: 1/9/2025 Final action: 1/9/2025
Title: Request for approval to execute an agreement with B2Z Engineering LLC in the amount of $69,578.00 for Professional Engineering Services regarding Construction Materials Testing and related Services for Sidewalk projects - N. Eldridge Pkwy - 2022, UPIN 23103MF2RP01, Precinct 3, MWBE Contracted Goal: 100%.
Attachments: 1. 25-0352-Consultant-UPIN 23103MF2RP01- B2Z Engineering-Sidewalk N. Eldridge-P3-01092025-Updated

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): UPIN - 23103MF2RP01; 24/0224

Vendor/Entity Legal Name (if applicable): B2Z Engineering LLC

 

MWBE Contracted Goal (if applicable): 100% - SBE/WBE/DBE/MBE/SDB

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an agreement with B2Z Engineering LLC in the amount of $69,578.00 for Professional Engineering Services regarding Construction Materials Testing and related Services for Sidewalk projects - N. Eldridge Pkwy - 2022, UPIN 23103MF2RP01, Precinct 3, MWBE Contracted Goal: 100%.

end

 

Background and Discussion:

 

This project contains a 5’ wide concrete sidewalk along N. Eldridge Pkwy and West Rd near Hargove Elementary School. The project is funded through CDBG grant by HCD. This project consists of furnishing all materials, labor, supervision, equipment, and incidentals to construct 5-foot-wide concrete sidewalks. Items of work include, but are not limited to, roadway excavation, removal & relocation of signs, removal of existing concrete pavement, concrete driveways, curb ramp, concrete curb, guardrail, traffic control, site restoration and clean-up. All work shall be performed in accordance with the specifications, construction drawings, any applicable local, state and federal codes, ordinances and regulations. All pedestrian facilities shall be ADA compliant. This project will be federally funded by the U.S. Housing and Urban Development Department (HUD) through the Harris County Community Services Department (HCCSD). Applicable requirements include, but are not limited to, compliance with Davis-Bacon and Related Acts, Fair Labor Standards, Equal Employment Opportunity, Affirmative Action, Section 3 of the HUD Act of 1968, and contracting with small, minority and disadvantaged firms, as detailed in the project manual.

Expected Impact:

 

This agreement will allow the firm to conduct field and laboratory testing on soil, concrete, asphalt and various other construction materials to ensure the material’s compliance with Harris County Engineering Department’s adopted standards and specifications as required by state law.

 

Alternative Options:

 

Construction materials testing is required by state law.  Thus, alternatives include issuing a purchase order for similar services to a different vendor or cancelling this construction project.

 

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  Choose an item.

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

04/23/2024

129 (24-2124)

Approved Public Necessity

10/08/2024

103 (24-6209)

Approved Authorization to Negotiate

 

Location:

Address (if applicable): N. Eldridge Pkwy.

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other FUND 3109

$

$69,578.00

$69,578.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$69,578.00

$69,578.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$69,578.00

$69,578.00

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 1/9/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Senior Director, Capital Project Infrastructure, Harris County Engineering Department; Corey D. Ritter, CET, Manager of Construction Materials Testing

 

Attachments (if applicable): N/A