Legislation Details

File #: 25-4972    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 7/30/2025 In control: Commissioners Court
On agenda: 8/7/2025 Final action: 8/7/2025
Title: Request by the Office of the Purchasing Agent for approval of an award on the basis of best bids meeting specifications to RES Gulf Coast, LLC dba LECON, Inc; and ECON Development, Inc. in the amount of $5,415,851 based on estimated quantities and fixed unit pricing for general drainage system repairs in South Harris County for the Flood Control District for the period of September 1, 2025 - August 31, 2026 with four (4) one-year renewal options, with certain items not being awarded, and for the County Clerk to execute any applicable bonds to be received (250003), MWBE Contracted Goal: 18.58%.

Primary Department: Purchasing

Primary Department Head/Elected Official: Paige McInnis

 

Secondary Department: Flood Control District

Secondary Department Head/Elected Official: Tina Petersen

 

Regular or Supplemental RCA: Supplemental RCA

Type of Request: Contract - Award

 

Project ID (if applicable): 250003

Vendor/Entity Legal Name (if applicable): RES Gulf Coast, LLC dba LECON, Inc; and ECON Development, Inc.

 

MWBE Contracted Goal (if applicable): 18.58%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable):

Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

 

Request Summary (Agenda Caption):

title

Request by the Office of the Purchasing Agent for approval of an award on the basis of best bids meeting specifications to RES Gulf Coast, LLC dba LECON, Inc; and ECON Development, Inc. in the amount of $5,415,851 based on estimated quantities and fixed unit pricing for general drainage system repairs in South Harris County for the Flood Control District for the period of September 1, 2025 - August 31, 2026 with four (4) one-year renewal options, with certain items not being awarded, and for the County Clerk to execute any applicable bonds to be received (250003), MWBE Contracted Goal: 18.58%.

end

 

Background and Discussion:

The Contract consists of project work orders that will be issued to the Contract for execution.  Project work orders will include general earthen and concrete repairs, for projects located in southern Harris County, Texas.  Major emphasis of the project work order will be larger earthen slope failures and concrete channel lining repairs throughout the Flood Control District.  This work will include but not be limited to full concrete panel replacement, concrete lining repairs - partial depth with engineered ductal mortar (EDM), headwall/wingwalls repairs with EDM, disposal of sediment accumulations on concrete lined channels, filling voids behind concrete channel lining, light erosion repair with granular 3” X 5” fill and riprap installation, earthen slope failure, earthen toe failure, sinkholes, outfall pipe removal and replacement, inlet structure removal and replacement, concrete channel lining removal and related items.  These services will provide support for infrastructure work that will be executed as a result of the passage of the “Maintenance Matters” Proposition in November 2024.

 

 

Expected Impact:

The intent of this project work order repair Contract is to establish a means for conducting priority repair work orders throughout southern Harris County, Texas. 

 

Alternative Options:

No award will increase the response time to the work major earthen and concrete repair projects to reduce flooding within the watersheds located throughout the county. 

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):   N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

01/23/2025

228

Transmittal by Purchasing of a project scheduled for advertising

 

Location:

Address (if applicable): N/A

Precinct(s): Countywide

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Tax Revenue - FCD

$

$5,415,851

$5,415,851

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$5,415,851

$5,415,851

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$5,415,851

$5,415,851

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 8/7/2025

Anticipated Implementation Date (if different from Court date): 9/1/2025

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Dalton Krueger, P.E., Project Manager, Maintenance Engineering Dept.; Maria Heinzmann, Senior Buyer, Harris County Purchasing

 

Attachments (if applicable): Letter, Bid Table.