Title: Request by the Flood Control District for approval to accept an amendment to an agreement with the Texas Division of Emergency Management to extend the period of performance to April 1, 2028, for the Federal Emergency Management Agency PreDisaster Mitigation Grant (Sims Bayou Watershed, Bond ID C-09, Project ID C147-00-00-E001, Precinct 1).
Attachments: 1. Channel Conveyance_Backup.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Primary Department: Flood Control District

Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM, Executive Director

 

Secondary Department: N/A

Secondary Department Head/Elected Official:

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): C147-00-00-E001

Vendor/Entity Legal Name (if applicable): Texas Division of Emergency Management

 

MWBE Contracted Goal (if applicable):

MWBE Current Participation (if applicable):

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): 0%

Justification for 0% Grant Indirect Costs Rate (if applicable): HCFCD, HCTRA, HHS

 

Request Summary (Agenda Caption):

title

Request by the Flood Control District for approval to accept an amendment to an agreement with the Texas Division of Emergency Management to extend the period of performance to April 1, 2028, for the Federal Emergency Management Agency Pre-Disaster Mitigation Grant (Sims Bayou Watershed, Bond ID C-09, Project ID C147-00-00-E001, Precinct 1).

end

 

Background and Discussion:

It is recommended that the Harris County Flood Control District be authorized to accept a Period of Performance (POP) extension for the C147-00-00 Channel Conveyance Improvements. The project is progressing through design, with 30% design completed and prepared for submittal. Continued coordination with grant agencies and regulatory partners has identified the need for additional time to finalize design direction and ensure alignment across federal, state, and local funding programs. The extension will allow the Flood Control District to maintain eligibility under existing grant awards, accommodate pending design decisions, and support development of subsequent design deliverables while assessment of permitting requirements and long-term schedule implications continues. This action ensures the project remains in good standing and can move forward without disruption as the Flood Control District refines the scope and prepares upcoming submittals. The amendment extends the period of performance to April 1, 2028.

 

Expected Impact:

The project includes the deepening of an existing Stormwater Detention Basin and channel conveyance improvements from north of the Sam Houston Tollway to where the tributary joins Sims Bayou near Trafalgar Drive. This project will reduce the risk of flooding for residents and, therefore, shrink the regulatory floodplain while avoiding adverse impacts to Sims Bayou or to the natural environment. The POP extension will support continued development of the project’s design, enabling the Flood Control District to advance planned conveyance improvements that aim to reduce flood risk in the project area. Maintaining the project schedule ensures eligibility for existing grant funding and allows the Flood Control District to prepare bid-ready design documents aligned with long-term watershed resilience goals. The Flood Control District will utilize its resources and applicable consultants throughout the project, as well as manage all grant compliance activities in accordance with Harris County statutes, Texas state law, and Policy regarding Federal Grant Awards.

 

Alternative Options:

The alternatives are: 1) not to accept the grant amendment, wherein awarded unused grant funding would be returned to FEMA at the end of the existing period of performance on September 13, 2026, and the project loses funding, or 2) the project’s engineering and construction will need to be funded entirely with local funding.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

04/04/2023

203.

Grant Application

03/26/2024

295.

Grant Award

 

Location: N/A

Address (if applicable):

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 12/3/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Order and Grant Amendment Approval Letter