Title: Request for approval of a change in contract with NBG Constructors, Inc., in connection with Bridge Construction (Pedestrian) - Hill at Sims Bayou - 2020, with an addition in the amount of $6,898.79, Job No. 23/0187-1, UPIN 21101MF1T401, Precinct 1, MWBE Contracted Goal: 25%, MWBE Current Participation: 36.37%.
Sponsors: Mony Hossain

Primary Department: County Engineer

Primary Department Head/Elected Official:  Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 1

Secondary Department Head/Elected Official: Rodney Ellis

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 23/0187, UPIN 21101MF1T401 

Vendor/Entity Legal Name (if applicable): NBG Constructors, Inc.

 

MWBE Contracted Goal (if applicable): 25%

MWBE Current Participation (if applicable): 36.37%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with NBG Constructors, Inc., in connection with Bridge Construction (Pedestrian) - Hill at Sims Bayou - 2020, with an addition in the amount of $6,898.79, Job No. 23/0187-1, UPIN 21101MF1T401, Precinct 1, MWBE Contracted Goal: 25%, MWBE Current Participation: 36.37%.

end

 

Background and Discussion:

Project Includes the construction of a signature pedestrian bridge over Sims Bayou (C100-00-00) to connect the trails on both sides of the Bayou.

 

This change in contract includes:

•                     PCO-1: New scope item for additional work needed for column design changes.

 

Expected Impact:

Change will allow for the bridge to be constructed per the Architects ultimate vision.

 

Alternative Options:

Build bridge per the original plans. 

 

 

 

 

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: G: Expand and optimize multimodal transportation options.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  G3: Develop a bike plan to make Harris County a Gold-level Bicycle Friendly Community.

Economy Initiative (Goal 3): J2: Increase the strength and size of MWBE prime vendors.

Health Initiative (Goal 4): N3: Promote increased physical activity of residents.

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

08/08/2023

23-4511

Contract Award

 

Location:

Address (if applicable):

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3002

$

$6,898.79

$6,898.79

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$6,898.79

$6,898.79

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$6,898.79

$6,898.79

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 2/6/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Engineering Department

 

Attachments (if applicable): County Auditor’s Form 1258B