File #: 24-3584    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 6/10/2024 In control: Commissioners Court
On agenda: 6/25/2024 Final action: 6/25/2024
Title: Request for approval of a change in contract with Millis Equipment, LLC, in connection with Hufsmith-Kohrville Road 2, with an addition in the amount of $1,433.00, Job No. 23/0308-1, UPIN 15104M23NP02, Precinct 3, MWDBE Contracted Goal: 28%, MWDBE Current Participation: 36.59%.

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 23/0308, UPIN 15104M23NP02

Vendor/Entity Legal Name (if applicable): Millis Equipment, LLC

 

MWDBE Contracted Goal (if applicable): 28%

MWDBE Current Participation (if applicable): 36.59%

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Millis Equipment, LLC, in connection with Hufsmith-Kohrville Road 2, with an addition in the amount of $1,433.00, Job No. 23/0308-1, UPIN 15104M23NP02, Precinct 3, MWDBE Contracted Goal: 28%, MWDBE Current Participation: 36.59%.

end

 

Background and Discussion:

Project includes the reconstruction of Hufsmith-Kohrville Road from Hollow Glen Lane to 500' North of Ezekiel from 2 lane asphalt road to 4 lane concrete curb and gutter boulevard with 32' raised median with traffic signals at Lacey Road and Ezekiel Road. There are two outfalls within limits of the project, North Pointe Boulevard and Champion Wood Drive detention ponds.

 

Change will allow replacing of reinforced concrete pipe to polypropylene pipe.  Polypropylene pipe was recently added to Harris County specifications and the contractor requested to replace reinforced concrete pipe with polypropylene through submittal.  This change will require less maintenance and greater longevity that will save a significant amount of money to Harris County in the long run. 

 

New Items

THERMOPLASTICE PIPE (PP) (18”)                                                                                    $4,005.00

THERMOPLASTICE PIPE (PP) (24”)                                                                                    $287,538.00

THERMOPLASTICE PIPE (PP) (36”)                                                                                    $117,480.00

THERMOPLASTICE PIPE (PP) (42”)                                                                                    $328,670.00

 

 

 

 

 

Deduct Existing Items

REINFORCED CONCRETE PIPE (18”) RUBBER GASKET                     $4,560.00

REINFORCED CONCRETE PIPE (24”) RUBBER GASKET                     $235,800.00

REINFORCED CONCRETE PIPE (36”) RUBBER GASKET                     $140,700.00

REINFORCED CONCRETE PIPE (42”) RUBBER GASKET                     $355,200.00

 

Expected Impact:

Change allows the contractor to be appropriately compensated for the work performed while mitigating the additional cost as much as possible.

 

Alternative Options:

The alternative was to proceed with original design, but the alternative option is more durable, long life and will be installed easier.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

x Transportation

_ Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

11/14/2023

23-6678

Contract Award

 

Location: Hufsmith-Kohrville Rd from Hollow Glen Lane to 500' North of Ezekiel

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other Fund 3109, 3002

$

$1,433.00

$1,433.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$1,433.00

$1,433.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$1,433.00

$1,433.00

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: June 25, 2024

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Erwin Burden, PE, Senior Director of Capital Project Infrastructure, Harris County Engineering Department

Attachments (if applicable): County Auditor’s Form 1258B