Legislation Details

File #: 25-1758    Version: 1 Name:
Type: Negotiation Status: Passed
File created: 3/12/2025 In control: Commissioners Court
On agenda: 3/27/2025 Final action: 3/27/2025
Title: Request for approval to negotiate an agreement with Siegfried Engineering & Construction, LLC for construction engineering inspection services for Concrete Repairs at the Washburn Tunnel (Precinct 2, MWBE Contracted Goal: 19.6%).

Primary Department: Toll Road Authority

Primary Department Head/Elected Official: Roberto Treviño, P.E., Executive Director

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Negotiation

 

Project ID (if applicable): 24-6001-M

Vendor/Entity Legal Name (if applicable): Siegfried Engineering & Construction, LLC

 

MWBE Contracted Goal (if applicable): 19.6%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to negotiate an agreement with Siegfried Engineering & Construction, LLC for construction engineering inspection services for Concrete Repairs at the Washburn Tunnel (Precinct 2, MWBE Contracted Goal: 19.6%).

end

 

Background and Discussion:

On February 27, 2024, Commissioners Court approved the advertisement for concrete repairs at the

Washburn Tunnel. Re-occurring inspections of the Washburn Tunnel are performed by TxDOT and HCTRA’s

engineering consultants and generate inspection reports that contain issues that need to be addressed. These

repairs will address items identified from inspection reports. Selected firm will be responsible for construction engineering inspection services.

 

Expected Impact:

This project will repair concrete cracks and spalling of the tunnel liner, masonry brick, and other related concrete items at the Washburn Tunnel to ensure continued proactive maintenance of HCTRA’s infrastructure.  

 

Alternative Options:

No other recommended solutions for this identified need.

 

County Strategic Plan Goal:  N/A

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):   N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

2/27/2024

152

Approval for advertise proposals/bids

6/25/2024

136

Approval for award bid

 

Location:

Address (if applicable):

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Washburn Tunnel Operations and Maintenance

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 3/27/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Nicole Stuttz, Chief of Staff, Harris County Toll Road Authority

 

Attachments (if applicable): N/A