Legislation Details

File #: 25-6432    Version: 1 Name:
Type: Grant Status: Passed
File created: 10/3/2025 In control: Commissioners Court
On agenda: 10/16/2025 Final action: 10/16/2025
Title: Request by the Flood Control District for approval to submit an application to the Texas Water Development Board for grant funds in the amount of $2,500,000, with no required match, for Halls Aldine Westfield South Stormwater Detention Basin and Mainstem Channel Conveyance Improvements (Halls Bayou Watershed, Bond ID C-41, Precinct 2).
Attachments: 1. FINAL FCD Backup Application Halls Aldine.pdf

Primary Department: Flood Control District

Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Grant - Application

 

Project ID (if applicable): N/A

Vendor/Entity Legal Name (if applicable): Texas Water Development Board

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): HCFCD, HCTRA, HHS

 

Request Summary (Agenda Caption):

title

Request by the Flood Control District for approval to submit an application to the Texas Water Development Board for grant funds in the amount of $2,500,000, with no required match, for Halls Aldine Westfield South Stormwater Detention Basin and Mainstem Channel Conveyance Improvements (Halls Bayou Watershed, Bond ID C-41, Precinct 2).

end

 

Background and Discussion:

It is recommended that the Flood Control District be authorized to apply for grant award funds from the Texas Water Development Board to fund the Halls Aldine Westfield South Stormwater Detention Basin & Mainstem Channel Conveyance Improvements in the Halls Bayou Watershed. The 89th Texas Legislature allocated funds in Senate Bill 1 to the Harris County Flood Control District. Senate Bill 1 was signed by the Governor on June 22, 2025, and was effective on September 1, 2025. This allocation from the Texas Legislature is being obtained through the Texas Water Development Board. The project in Senate Bill 1 is the Halls Aldine Westfield South Stormwater Detention Basin & Mainstem Channel Conveyance Improvements in the Halls Bayou Watershed (HC Pct. 2). These grant funds were appropriated in Senate Bill 1 from the 89th Texas Legislature, secured by Representative Walle, HD140.

 

Expected Impact:

This grant would fund feasibility, preliminary engineering and design. The feasibility, preliminary engineering report, and design will determine the ultimate benefits provided. The proposed P118-00-00 Halls Aldine Westfield South Stormwater Detention Basin & Mainstem Channel Conveyance includes approximately 950 acre-feet of storage within a proposed 90-acre site between Mesquite Street and Halls Bayou. The channel improvements are approximately 5,500 linear feet along Halls Bayou. Due to the size of the basin area, a phased implementation plan will likely be proposed. It is estimated that following the ultimate project, the 100-yr (preAtlas-14) inundation area would be removed from approximately 339 structures, approximately 6 miles of roadway, and approximately 221 acres. The Flood Control District will utilize its resources and applicable consultants during the design and construction phases of the project, as well as the management of the grant approval process in compliance with Harris County statutes, applicable laws of the state of Texas, and Policy regarding Federal Grant Awards. 

 

Alternative Options:

The alternative is to not apply for grant funding, wherein existing flooding risks remain in place, or the project will need to be entirely funded with local funding.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):   N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: This action is consistent with the Strategic Plan overarching goals of reducing the number of structures at risk of flooding and improving the quality of life of Harris County residents.

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

 

 

 

 

Location: Halls Aldine Westfield South Stormwater Detention Basin & Mainstem Channel Conveyance

Improvements are bounded to the west by Hardy Toll Road, to the east by Aldine Westfield Road, to the north

by Halls Bayou, and to the south by Mesquite Street.

Address (if applicable):

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

4.a.3 - Engineering Services

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$2,500,000

$2,500,000

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 10/16/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Order, Draft Application, Map, and Resolutions