Legislation Details

File #: 25-1087    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 1/31/2025 In control: Commissioners Court
On agenda: 2/13/2025 Final action: 2/13/2025
Title: Request for approval of an award on the basis of low bid to Reliance Construction Services, L.P. in the amount of $993,681 for construction of a water distribution system for Berwyn Drive for Precinct 2, and for the County Clerk to execute any applicable bonds to be received (240430), MWBE Contracted Goal: 22.74%.

Primary Department: Purchasing

Primary Department Head/Elected Official: Paige McInnis

 

Secondary Department: County Engineer

Secondary Department Head/Elected Official: Milton Rahman

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): 240430

Vendor/Entity Legal Name (if applicable): Reliance Construction Services, L.P.

 

MWBE Contracted Goal (if applicable): 22.74%

MWBE Current Participation (if applicable):

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable):

Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.

 

Request Summary (Agenda Caption):

title

Request for approval of an award on the basis of low bid to Reliance Construction Services, L.P. in the amount of $993,681 for construction of a water distribution system for Berwyn Drive for Precinct 2, and for the County Clerk to execute any applicable bonds to be received (240430), MWBE Contracted Goal: 22.74%.

end

 

Background and Discussion:

Construction of a new water distribution system and service connections to eligible residents along Berwyn Drive including plugging water wells. Project is one phase of a multi-phase program that builds upon previous phases to bring public water to areas where residents use water wells, which are shallow and contamination prone. City of Houston will own and operate the system after construction.

 

 

Expected Impact:

Connect residential properties to the newly installed water distribution system to provide reliable quality drinking water and fire hydrants.

 

 

Alternative Options:

Continue the use of water wells that are prone to contamination.

 

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H4: Consistently embed sustainability considerations in the project planning and design process.

Economy Initiative (Goal 3): J2: Increase the strength and size of MWBE prime vendors.

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

10-8-24

102/24-6228

Request for approval to execute an Interlocal Agreement with Airline Improvement District to provide leverage funding for a Community Development Block Grant Funded project, Water Distribution System - Berwyn Drive

1-9-25

334/25-0060

Transmittal by the Office of the Purchasing Agent of a project scheduled for advertisement for construction of a water distribution system for Berwyn Drive for Precinct 2 (240430).

 

Location:

Address (if applicable): Berwyn Drive

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Grant

$

$993,681.31

$993,681.31

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$993,681.31

$993,681.31

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$993,681.31

$993,681.31

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 2/13/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Cassandra Green P.E., ENV SP, Director of Technical Services Division, Office of the County Engineer; Maria Heinzmann, Senior Buyer, Harris County Purchasing

 

Attachments (if applicable): Letter