Legislation Details

File #: 25-3109    Version: 1 Name:
Type: Asset Management Status: Passed
File created: 5/8/2025 In control: Commissioners Court
On agenda: 5/22/2025 Final action: 5/22/2025
Title: Request for approval to accept a real estate conveyance of a 0.0141 acre Temporary Construction License from CenterPoint Energy, Inc. a Texas limited liability company, TCL 4 for Peek Road - from 1600' N of the Grand Parkway to 580' S of Clay - 2021 project, and that the County Judge execute the Temporary Construction License Agreement, UPIN 21103N301030005, Precinct 4.
Attachments: 1. 25-3109-(AssetManagement)-21103N301030005-Center Point Energy Inc.-Peek RdNGrandPkwytoClay-P4

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: Not applicable

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Asset Management

 

Project ID (if applicable): 21103N301030005

Vendor/Entity Legal Name (if applicable): CenterPoint Energy, Inc. a Texas limited liability company

 

MWBE Contracted Goal (if applicable): Not applicable

MWBE Current Participation (if applicable): Not applicable

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): Not applicable

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to accept a real estate conveyance of a 0.0141 acre Temporary Construction License from CenterPoint Energy, Inc. a Texas limited liability company, TCL 4 for Peek Road - from 1600' N of the Grand Parkway to 580' S of Clay - 2021 project, and that the County Judge execute the Temporary Construction License Agreement, UPIN 21103N301030005, Precinct 4.

end

 

Background and Discussion:

The proposed Peek Road reconstruction consists of designing two southbound lanes on Peek Road to upgrade the existing 2 lane portion of Peek Road to a standard four (4) lane concrete boulevard with 32' medians, left turn lanes, and driveways within an existing 100' ROW with storm sewer.

 

Expected Impact:

The proposed reconstruction improvements will impact proposed driveways that will need to be reconstructed and adjacent property to be regraded.

 

Alternative Options:

An alternative option is not to construct the concrete boulevard and leave the existing conditions of the road as is.

 

 

 

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: Developing HC roadway network and infrastructure to respond to the traffic demand , increase travel time reliability , reduce travel time delay and improve safety an deficiency.

 

Prior Court Action (if any): None

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

Address (if applicable): 0 Peek Road, Katy, TX 77493

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 5/22/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Michael Ware, Director, Real Property Division

 

Attachments (if applicable): Temporary Construction License Agreement; Exhibit