File #: 24-3692    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 6/12/2024 In control: Commissioners Court
On agenda: 6/25/2024 Final action: 6/25/2024
Title: Request for approval to execute an agreement with B2Z Engineering, LLC, for Professional Engineering Services in the amount of $494,732.35 in connection with Corridor Study - W. Mount Houston Road and Airline Drive - 2023 from IH 45 to Airline Drive and W. Mount Houston Road to Canino Road on Airline Drive, UPIN 24102MF35F01, Precinct 2, MWDBE Contracted Goal: 20%.
Attachments: 1. 24-3692-Consultant- UPIN 24102MF35F01-B2Z Engineering- Corridor Study - W Mount Houston- 06.25.2024

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV-SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): 24102MF35F01

Vendor/Entity Legal Name (if applicable): B2Z Engineering

 

MWDBE Contracted Goal (if applicable): 20%

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval to execute an agreement with B2Z Engineering, LLC,  for Professional Engineering Services in the amount of $494,732.35 in connection with Corridor Study - W. Mount Houston Road and Airline Drive - 2023 from IH 45 to Airline Drive and W. Mount Houston Road to Canino Road on Airline Drive, UPIN 24102MF35F01, Precinct 2, MWDBE Contracted Goal: 20%.

end

 

Background and Discussion:

Harris County Commissioners Court approved the Harris County Vision Zero Action Plan on September 13, 2022. The Harris County Vision Zero Action Plan has identified corridors and intersections on the High Injury Network to prioritize safety improvement projects. As part of Commissioner Adrian Garcia’s Revive2Thrive initiative, Precinct 2 proposed to conduct a corridor study on W. Mount Houston Road from IH 45 to Airline Drive (0.8 miles) and Airline Drive from W. Mount Houston Road to Canino Road (1.7 miles).

 

Expected Impact:

The W. Mount Houston Road and Airline Drive corridor study will include extensive public engagement; in depth safety analysis; and concept development of an inclusive, resilient, and safe corridor. The study will provide engineering solutions for improving safety along the corridor and at intersections for all roadway users, including bicyclists and pedestrians, who are the most vulnerable roadway users. The study will also provide preliminary cost estimates for implementing the preferred corridor concept for W. Mount Houston Road and Airline Drive. 

 

Alternative Options:

Roadway improvements on W. Mount Houston Road and Airline Drive will be conducted without a concept developed through community engagement and safety analysis.

 

Alignment with Goal(s):

_ Justice and Safety

X Economic Opportunity

_ Housing

_ Public Health

X Transportation

_ Flooding

X Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

09.19.23

158

Authorization to Negotiate for Professional Engineering Services in connection with Corridor Study - W. Mount Houston Road and Airline Drive - 2023 from IH 45 to Airline Drive on W. Mount Houston Road and W. Mount Houston Road to Canino Road on Airline Drive, UPIN 24102MF35F01, Precinct 2.

 

Location:

Address (if applicable): W. Mount Houston Road from IH 45 to Airline Drive and Airline Drive from

W. Mount Houston Road to Canino Road

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other Precinct 2 Bond Funds

$

$494,732.35

$494,732.35

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$494,732.35

$494,732.35

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$494,732.35

$494,732.35

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: June 25, 2024

Anticipated Implementation Date (if different from Court date):

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Patrick Mandapaka, PhD, AICP, Direction of Community Planning and Transportation, HCED

 

Attachments (if applicable): Professional Services Agreement