Legislation Details

File #: 26-5497    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 8/12/2026 In control: Commissioners Court
On agenda: 8/25/2026 Final action: 8/25/2026
Title: Request for approval to execute an agreement with Autoarch Architects, LLC in the amount of $259,000.00 for professional architectural and engineering services, including design, bidding and construction support, and coordination with relevant stakeholders, in connection with the HVAC MEP Upgrades - Annex 25, 7330 Spencer - 2025, UPIN 26035MF40701, Precinct 2, MWBE Contracted Goal: 19.48%.
Sponsors: Mony Hossain

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 2

Secondary Department Head/Elected Official: Adrian Garcia, Commissioner

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): UPIN 26035MF40701

Vendor/Entity Legal Name (if applicable): Autoarch Architects, LLC

 

MWBE Contracted Goal (if applicable): 19.48%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an agreement with Autoarch Architects, LLC in the amount of $259,000.00 for professional architectural and engineering services, including design, bidding and construction support, and coordination with relevant stakeholders, in connection with the HVAC MEP Upgrades - Annex 25, 7330 Spencer - 2025, UPIN 26035MF40701, Precinct 2, MWBE Contracted Goal: 19.48%.

end

 

Background and Discussion:

Harris County is undertaking the Countywide HVAC Replacement Program, which includes multiple projects addressing system replacements, repairs, and major upgrades across County facilities. The project described here represents one component of this broader program and supports ongoing efforts to modernize HVAC infrastructure and maintain safe, functional, and codecompliant buildings. The full FY2025 program authorization totals $35,940,000, of which this project is a part.

 

This request is for architectural and engineering professional services for Annex 25, located at 7330 Spencer, Pasadena, TX 77505 to provide full services for the upgrade and replacement of the existing HVAC system.

 

Expected Impact:

This project will help replace aging and endoflife HVAC systems, improving temperature control, air quality, and overall building performance. It also supports critical lifesafety functions such as smoke detection, damper operation, and emergency exhaust. As part of the Countywide program, the project reduces deferred maintenance and helps prevent operational disruptions.

 

Alternative Options:

The alternative option would be to keep the existing HVAC systems in place. HVAC units are aging or at endoflife, with increasing failures and deferred maintenance needs. Leaving them asis would increase lifesafety risks, delay new construction and renovation efforts, and lead to higher longterm costs due to continued deterioration and rising material and labor prices.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): T2: Make County buildings more energy efficient.

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

12-10-2024

119/24-7563

Request for approval of a Final Investment Memo for the Heating, Ventilation Air Conditioning (HVAC) Replacement Countywide project for an incremental authorization of $35,115,000 for an FY2025 total authorization of $35,940,000 (Approved)

 

Location:

Address (if applicable): 7330 Spencer HWY, Pasadena, TX 77505

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Professional Services - Design

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Commercial Paper 3227

$

$259,000.00

$259,000.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$259,000.00

$259,000.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$259,000.00

$259,000.00

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 8/25/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): Contract & Exhibits