Primary Department: Flood Control District
Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM, Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): P518-11-00-E002
Vendor/Entity Legal Name (if applicable): DNT Construction LLC
MWBE Contracted Goal (if applicable): 18.40%
MWBE Current Participation (if applicable): 15.44%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of change in contract No. 1 with DNT Construction LLC, for the Isom Stormwater Detention Basin, resulting in an addition of $37,952 to the contract amount (Halls Bayou Watershed, Bond ID C-41, Project ID P518-11-00-E002, Job No. 26/0086, Precinct 2, CDBG-DR, MWBE Contracted Goal: 18.40%, MWBE Current Participation: 15.44%).
end
Background and Discussion:
This change in contract is needed to complete the construction contract for this project. The project connects the P518-11-00 basin to the existing P518-11-00 wet-bottom basin and includes clearing and grubbing, demolition of existing structures, earthwork, installation of new drainage systems and stormwater control structures, all-weather access road and gates. The purpose of this contract change is to increase the quantities of construction fencing needed for AST habitat delineation and disposal of concrete rubble discovered on site. The contract change includes an increase in the project cost by $37,952.00 and 0 days. This represents a 0.39% increase to the original purchase order value of $9,770,000.00 and a 0.0% increase to the original duration of 310 days.
Expected Impact:
This change will allow the contractor to construct the project so that Harris County can realize intended flood risk reduction benefits.
Alternative Options:
This is an active construction contract, so there are not many alternatives to approving a change order other than cancelling the contract, which is not recommended as doing so would substantially delay the remaining work in the construction contract.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): H1: Complete and implement the Flood Resilience Plan.
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: N/A
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
01/08/2026 |
132. |
Award |
Location: Halls Bayou Watershed, located south of Isom Road, north of Halls Bayou, east of Chrisman Road and
west of Aldine Westfield
Address (if applicable):
Precinct(s): Precinct 2
|
Fiscal and Personnel Summary |
|
Service Name |
4.a.2 - Construction Services |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Bonds |
$ |
$37,952 |
$37,952 |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$37,952 |
$37,952 |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$37,952 |
$37,952 |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 11/12/2026
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District
Attachments (if applicable): Change in Contract